USPTO serial 79412565
ZENTARA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 25, 2025
- Examiner
- GARDNER, DAWNA BERYL
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with ZENTARA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Gabrielle A. Holley
Gabrielle A. Holley Holley & Menker, P.A.P.O. Box 96Solana Beach, CA 92075United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electronic and electric apparatus, instruments and parts thereof all for photovoltaic and wind energy production, namely, photovoltaic cells, photovoltaic inverters, photovoltaic modules, wind turbine controller and wind sleeves for indicating wind direction; installations, apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling energy, namely, electronic energy submeters for tracking and monitoring energy usage and power distributing boxes; power supply units, namely, electrical power supplies; direct-current power supply apparatus, namely, direct current converters; high-frequency clocked electric supply apparatus, namely, high frequency switches; photovoltaic apparatus and installations for solar electricity production, namely, photovoltaic cells, photovoltaic inverters and photovoltaic modules for solar electricity production; solar panels for electricity production; downloadable software for use in monitoring and distributing solar energy, gas energy, water energy and wind energy | ACTIVE | — |
| 039 | Delivery of energy, namely, distribution of electrical energy, gas and water; distribution of energy for heating districts on power grid; energy storage services, namely, storing, transmitting and distributing electrical energy and fuels | ACTIVE | — |
| 042 | Scientific and technological services, namely, research and design services in the fields of energy and energy engineering; design and development of computers and software; technological advisory services in the field of electricity and energy; provision of scientific information and advice in the field of carbon offsetting; engineering services, namely, technical project planning in the field of carbon offsetting; scientific development of energy and electricity management systems; scientific development of energy storage solutions; design and development of energy distribution networks; research and development services relating to photovoltaic cells and electricity production; technological analysis regarding third-party electricity and energy needs; engineering services on energy supply systems; technical consultant services in the field of engineering for energy saving and energy efficiency; technological advice in the field of alternative energy production; technological consultant services in the field of energy production and use; design and development of photovoltaic systems | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Yamato Capital AG
- Other trademarks owned by Yamato Capital AG
- Other trademarks owned by Yamato Capital AG
- Other trademarks in Class 009
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named ZENTARA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 2, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 12, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 11, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 4, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 18, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 18, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 14, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 25, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 7, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 7, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 1, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 5, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 2, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 2, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 2, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 21, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 3, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 3, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 1, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 31, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 26, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 23, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 23, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 19, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |