USPTO serial 79412722
PRO INTEGRIS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 12, 2025
- Examiner
- SOLANO, CARLITA JAYE
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with PRO INTEGRIS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Janice Housey
Janice Housey Litmus Law PLLC4 Weems Lane #240Winchester, VA 22601United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for controlling electricity; apparatus and instruments, for monitoring the status, function, performance and efficiency of power generation and power transmission equipment and installations; downloadable cloud network monitoring software; electric monitoring apparatus for remote monitoring the status, function, performance and efficiency of power generation and power transmission equipment and installations; electronic load indicating devices, namely, electric sensors, electronic monitors and monitor modules for monitoring electric current and voltage; electrical signaling, measuring, counting, recording, monitoring, controlling, regulating devices, namely, electrical controllers, voltage regulators; electricity sensors; overvoltage protection relays; data processing apparatus; controllers and regulators, namely, controllers and regulators for power generation and power transmission; measuring, signaling, controlling and supervision apparatus, namely, power generation and power transmission measuring, signaling, converting, controlling and supervision apparatus; data networks, namely, computer hardware and downloadable software for power generation substation and power transmission substation operation and management for use in connection with power generation and power transmission; downloadable computer programs for data processing; downloadable computer programs for data processing for electric signaling, measuring, counting, recording, monitoring, controlling, regulating, visualizing, simulation, predicting, notifying and switching devices; downloadable computer programs for data capture and control of electrical values in electric energy transmission and distribution systems; computer hardware for computer security, computer network security, data security and internet security; downloadable or recorded computer software for computer security, computer network security, data security and internet security; downloadable or recorded computer software for encryption; safety, security, protection and signaling devices, namely, personal security alarms, sound alarms, smoke alarms, security and fire alarms, flashing and steady safety lights | ACTIVE | — |
| 037 | Assembly, maintenance and repair of installations, devices and apparatus in the field of energy distribution and energy storage, in particular in the field of high voltage; installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; emergency servicing of apparatus for supplying electricity; repair or maintenance of power distribution or of control machines and apparatus | ACTIVE | — |
| 042 | power generation substation and power transmission substation construction design; power generation substation and power transmission substation design planning; power generation substation and power transmission substation design services; engineering design of power generation substations and power transmission substations; computer software design for others; industrial design; machine condition monitoring; services for monitoring industrial processes to ensure proper functioning; platform as a service (PaaS) featuring software for power generation substation and power transmission substation operation and management; software as a service (SaaS) featuring software for power generation substation and power transmission substation operation and management; development and customization of databases; development and customization of computer database software; development and customization and maintenance of computer database and computer software; electronic storage services for archiving databases; design of computer database software; installation and maintenance of database software; design and development of energy distribution and transmission software networks; engineering design and engineering design consultancy; electrical engineering services; power generation and power transmission management and operation software installation; computer software installation | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Siemens Energy Global GmbH & Co. KG
- Other trademarks owned by Siemens Energy Global GmbH & Co. KG
- Other trademarks owned by Siemens Energy Global GmbH & Co. KG
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named PRO INTEGRIS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 4, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 18, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 18, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 12, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 25, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 25, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 12, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 12, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 12, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 24, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 24, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 18, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 27, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 27, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 27, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 27, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 27, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 20, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 20, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 20, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 9, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 22, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 22, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 13, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 12, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 11, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 23, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Dec 23, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 23, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 23, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Dec 23, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 20, 2024 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 20, 2024 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 19, 2024 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |