USPTO serial 79414082
ISTEER
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 25, 2025
- Examiner
- MANCA, ALBERTO I
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with ISTEER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ronni S. Jillions
Ronni S. Jillions Fisher Broyles, LLP1625 K St. NWSuite 550Washington, DC 20006Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric motors for machines with a digital servo drive controller; drive system having two or more synchronous motors coupled through clutches to drive a common load | ACTIVE | — |
| 009 | Automatic steering apparatus for vehicles comprised of computer hardware and recorded computer software for steering vehicles; electronic power supplies for driving electric motors; electric power distribution machines for land vehicles; control machines and apparatus for land vehicles, namely, electronic control systems for machines, remote control telemetering machines and apparatus, electric control panels; inverters for land vehicles; battery for land vehicles; autonomous driving control systems for vehicles comprised of computer hardware and recorded software for autonomously controlling vehicles; downloadable computer software for autonomously controlling cars; sensors for land vehicles, namely, electric power steering torque sensors, sold as a component of the power steering system | ACTIVE | — |
| 012 | Electrically assisted land vehicles; motors, electric, for land vehicles; electric drive unit being electric drives for land vehicles; transmissions, for land vehicles; steering wheels for automobiles; fuel cell land vehicles and their structural parts; AC motors and direct current motors for land vehicles; drive shaft, axles and brake rotors for land vehicles; power transmissions and gears for land vehicles; steering units for land vehicles; electric steering units for land vehicles; steering wheel attachment comprised of an electric motor and drive gear and a ring gear that when activated by an external controller, turns the steering wheel to effect automatic vehicle steering in straight or curved paths | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by OGNIBENE POWER S.P.A.
- Other trademarks owned by OGNIBENE POWER S.P.A.
- Other trademarks owned by OGNIBENE POWER S.P.A.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 012
- Similar marks named ISTEER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 2, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 13, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 13, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 1, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 31, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 25, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 7, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 7, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 1, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 5, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 5, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 5, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 5, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 5, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 22, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 22, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 22, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 17, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 28, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 28, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 25, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 24, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 18, 2025 | CRSN | CORRECTION SENT TO IB | — |
| Mar 18, 2025 | CRCR | CORRECTION CREATED FOR IB | — |
| Mar 10, 2025 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Mar 7, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 7, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 7, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 7, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 21, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 20, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 10, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 10, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 2, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |