Drawing for MULTICOVER

USPTO serial 79415504

MULTICOVER

Reviewed by CopyMark Law Group

Reg. 8097865Status 700Registered
Filing date
Status date
Registration date
Jan 13, 2026
Examiner
MINERVINO, CAMDEN A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MULTICOVER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Melanie I. Rauch

Melanie I. Rauch Setter Roche Smith & Shellenberger LLP1860 Blake StSuite 500Denver, CO 80202

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; steel; unprocessed and semi-processed non-precious metals and their alloys, all of the foregoing for further manufacture; steel and steel alloys, semi-wrought, for further manufacture, in the form of profiles, profiled sections and profiled plates; thin metal bands; wrapping or binding bands of metal; sheet metal, not of precious metal; sheet steel being steel sheets; building panels of metal; floor panels of metal; wall panels of metal; door panels of metal; metal roofing panels; metal ceiling panels; fence panels of metal; ceiling panels of metal; metal facade panels for construction purposes; steel in the form of strips being strip steel; steel in the form of coiled bands and coils; metal and steel for building purposes, namely, building flashing and metal trim for buildings; construction materials of metal and steel, namely, exhaust vent hoses for external ventilation of furnaces, heaters, stoves and boilers; construction materials of metal and steel, namely, cable trays used in building construction; construction materials of metal and steel, namely, ventilating ducts, ducts for ventilating installations, ducts for air-conditioning installation and heating ducts of metal and steel; metal goods and steel goods for building purposes, namely, cladding of metal and steel; construction elements of steel, namely, supports, braces, piles, drains for use in construction of basement waterproofing systems, shores; construction elements made of metal, namely, fabricated metal components for building foundations; reinforcement materials of metal and steel for building; linings of metal and steel for building purposes; beams of metal; pipes, tubes, industrial hoses, and metal fittings therefor, all of the foregoing being of metal and steel; couplings of metal for tubes; ducts of metal and steel for guiding cables being metal diverting elements for cables, namely, routing elements; shaft covers of metal, namely, lids of metal and steel; framework structures of metal and steel for buildings and construction; frames of metal and steel for building, namely, for holding and securing storage racks other than furniture; steel frames for construction purposes, namely, steel frames for building; frames of metal for building; building wall framing made of steel; cladding of metal and steel for building; cladding of metal and steel for facades for building; linings of steel for building purposes, in the form of sheets, thin bands and tiles; roofs being roofing of metal, doors, gates, window trim and window casements of metal; door and window frames of metal and steel; metal roll shutters and jalousies of metal and steel; window sills of metal; sliding doors and slide windows of metal; door trim and door casing of metal and steel; metal hardware, namely, casements of metal, casings of metal, steel castings, metal joinery fittings, furniture fittings of metal, metal window fittings, door fittings of metal, metal hinges for doors and windows, metal locks, decorative metal profiles for use in further manufacture; handles of metal and steel for windows and doors; fittings of metal for furniture; general purpose metal storage containers; storage tanks of metalACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 6, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 23, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 19, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB
Jul 18, 2026FIMPFINAL DISPOSITION PROCESSED
Jun 29, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 29, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 13, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jan 13, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 13, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 25, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 25, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 19, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 27, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 27, 2025XAECEXAMINER'S AMENDMENT ENTERED
Oct 27, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Oct 27, 2025GNEAEXAMINERS AMENDMENT E-MAILED
Oct 27, 2025CNEAEXAMINERS AMENDMENT -WRITTEN
Oct 2, 2025XAECEXAMINER'S AMENDMENT ENTERED
Oct 2, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Oct 2, 2025GNEAEXAMINERS AMENDMENT E-MAILED
Oct 2, 2025CNEAEXAMINERS AMENDMENT -WRITTEN
Sep 30, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 29, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 29, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 19, 2025RFNTREFUSAL PROCESSED BY IB
Mar 29, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 29, 2025RFRRREFUSAL PROCESSED BY MPU
Feb 22, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Feb 21, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 19, 2025DOCKASSIGNED TO EXAMINER
Feb 18, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Feb 18, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 14, 2025LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED
Jan 30, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance