Drawing for NÜSSLI

USPTO serial 79417237

NÜSSLI

Reviewed by CopyMark Law Group

Reg. 8217347Status 700Registered
Filing date
Status date
Registration date
Apr 21, 2026
Examiner
HUSSAIN, TASNEEM
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with NÜSSLI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Donald Ersler

1165 Terrace DriveElm Grove, WI 53122United States

Goods and services

ClassDescriptionStatusFirst use
006Portable mobile buildings of steel and aluminum; transportable steel buildings; portable stages of metal; bleachers of metal; common metals and their alloys, metal ores; building materials of metal, namely, canopies, roofing panels, wall panels, beams, pre-fabricated architectural columns, structural frameworks, wall claddings of metal for building, scaffolding of metal, staircases of metal, prefabricated platforms of metal, bars for metal railings, duckboards of metal, stair treads of metal, guard rails of metal; transportable buildings of metal; non-electric cables and wires of metal; small items of metal hardware, namely, nuts, bolts, screws, springs, washers, heavy duty anchors and window and door fasteners; containers of metal for storage or transportACTIVE—
019Concrete building panels; building materials of concrete, namely, blocks, bricks, posts, slabs, panels, and ballasting components in the nature of concrete piles; transportable buildings of timber; floor boards and seating platforms in the nature of bleachers made of plastic materials for mobile buildings; construction materials not of metal, namely, framework for building, flagpoles being structures, prefabricated platforms, floors, semi-worked wood, floor tiles, doors, planks, joists, roofing, linings for building being cladding for building, roof coverings for building, facing sheets of plywood for building, surfacings in the nature of asphalt-based sealants for use on roofs for building, duckboards, and flooring materials made of plastic, wood or composite materials; non-metallic rigid pipes for building; transportable buildings not of metalACTIVE—
022Ropes and string; non-metal rockfall prevention nets for safety, protective, screening, cladding, and barrier purposes for construction and temporary structures; tarpaulins; awnings of textile or synthetic materials; sails for shading purposes; bags for the transport and storage of materials in bulkACTIVE—
037Work construction supervision services for construction projects; construction of prefabricated steel structures and buildings; building construction services; installation and repair services of prefabricated and modular buildings, building constructions and temporary building structures for sporting, educational and cultural events and exhibitionsACTIVE—
042Construction drafting and building design services as well as consultant services relating thereto; conducting of technical project studies, namely, feasibility studies in the field of environmental engineering; conducting of technical project studies, namely, engineering services for construction projects; engineering and architectural services; scientific and technological services, namely, research in the field of building construction; industrial analysis and industrial research, namely, feasibility and technical studies for construction projects in the field of building construction and industrial design services; quality control for others and authentication services in the field of temporary and modular building construction, namely, technology supervision and physical inspection of buildings for quality control purposesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 15, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 29, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 29, 2026FIMPFINAL DISPOSITION PROCESSED—
Aug 6, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 21, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 20, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 19, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 21, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 21, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 3, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 3, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 26, 2026GPNXNOTIFICATION PROCESSED BY IB—
Feb 25, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 11, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 10, 2026OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 3, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 2, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Feb 2, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 2, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 2, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 26, 2026LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 16, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 16, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 16, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 22, 2025RFNTREFUSAL PROCESSED BY IB—
Nov 5, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 5, 2025RFRRREFUSAL PROCESSED BY MPU—
Oct 10, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Sep 17, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 16, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2025DOCKASSIGNED TO EXAMINER—
Sep 10, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 10, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 20, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance