USPTO serial 79417418
BAC
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 30, 2025
- Examiner
- HUSSAIN, TASNEEM
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BAC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sara T. Colburn
Sara T. Colburn CANTOR COLBURN LLP20 Church St, 22nd FloorHartford, CT 06103-1221United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Cathodic protection and anti-corrosion apparatus and instruments, namely, rectifiers; junction boxes; power supplies; solar power towers; transformers and transformers as rectifiers; surveying apparatus and instruments; test meters as digital multimeters and clamp meters for measuring electricity; polarisation electric cells; electrodes, anodes, cathodes; pin-brazing apparatus and instruments, namely, lead-free solders in the electrical bonding and earthing industries; electric cables and connectors; mineral insulated electric cables and connectors; current interrupters, namely, current switches; battery packs; electronic data logging apparatus; testing and measuring apparatus and instruments for use in cathodic protection and corrosion prevention and control, namely, transformer rectifiers; structural parts for all the aforesaid | ACTIVE | — |
| 017 | Insulating materials and coatings for use in cathodic protection and corrosion prevention and control; non-metallic pipeline insulating tape; cable protectors being insulating materials; non-metal insulation flanges; insulated flexible pipes, not of metal; insulating materials for cables and electric conductors; non-metal isolation pipe joints. | ACTIVE | — |
| 019 | slag stone; stone; non-metallic minerals for building or construction | ACTIVE | — |
| 037 | Building construction, building insulation installation, and maintenance and repair services for cathodic protection and corrosion prevention and control apparatus and instruments; rental and leasing of construction equipment for use in relation to all of the aforesaid; construction supervision and information in relation to all of the aforesaid. | ACTIVE | — |
| 040 | Metal treatment services; metal protection, namely, laminating services; electro-plating; custom construction of cathodic protection and corrosion prevention and control apparatus and instruments; rental and leasing of electric soldering apparatus for use in relation to all of the aforesaid; information in relation to all of the aforesaid; pin brazing, namely, metal brazing; consultancy and advice in relation to metal treatment services, namely, abrasive polishing of metals and galvanizing of metal. | ACTIVE | — |
| 041 | Instructional classes, tutoring, and training services; arranging and conducting seminars; all the aforesaid in the fields of cathodic protection and corrosion prevention and control. | ACTIVE | — |
| 042 | Scientific research, design, development, material testing, and professional material testing advisory services in the fields of cathodic protection and corrosion prevention and control; surveying services; soil sampling for analysis purposes featuring soil resistivity and corrosivity surveys; corrosion surveys in the nature of engineering surveying; rental and leasing of surveying apparatus and instruments for use in relation to all of the aforesaid; technology supervision, consultancy, information and advice in relation to all of the aforesaid; consultancy and advice in relation to engineering in the fields of cathodic protection and corrosion prevention and control; custom construction being custom engineering of apparatus and instruments for use in the fields of cathodic protection and corrosion prevention and control. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BAC CORROSION CONTROL LIMITED
- Other trademarks owned by BAC CORROSION CONTROL LIMITED
- Other trademarks owned by BAC CORROSION CONTROL LIMITED
- Other trademarks in Class 009
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named BAC
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 6, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 30, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 19, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 13, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 13, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 30, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 30, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 30, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 11, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 11, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 5, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 9, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 8, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 8, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 8, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 8, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 30, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 30, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 30, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 27, 2025 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 27, 2025 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 27, 2025 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 21, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 21, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 21, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 19, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 2, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 2, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 26, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 25, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 25, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 24, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 24, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 20, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |