Drawing for DOKA FORMWORK & SCAFFOLDING. WE MAKE IT WORK.

USPTO serial 79417449

DOKA FORMWORK & SCAFFOLDING. WE MAKE IT WORK.

Reviewed by CopyMark Law Group

Reg. 8319846Status 700Registered
Filing date
Status date
Registration date
Jun 30, 2026
Examiner
DYER, ERIN ZASKODA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with DOKA FORMWORK & SCAFFOLDING. WE MAKE IT WORK.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Casey E. Wright

Casey E. Wright Barnes & Thornburg LLP11 South Meridian StreetIndianapolis, IN 46204United States

Goods and services

ClassDescriptionStatusFirst use
006Formwork being scaffolding and its replacement parts for concrete construction, namely, wall formwork, sliding formwork, frame formwork, beam formwork, column formwork, single-sided formwork, composite formwork, circular formwork, slab formwork, ceiling tables, panel slab formwork, beam ceiling formwork, monolithic formwork, climbing formwork, self-climbing formwork, crane climbing formwork, platform climbing formwork, cooling tower formwork, shaft formwork, dam formwork, facade formwork, tunnel formwork, tunnel formwork carriages, bridge formwork, metal cantilever form travellers being cantilevered brackets of metal for building bridges, metal composite forming carriages; load-bearing and support structures and their parts for formwork for concrete construction, namely, load-bearing scaffolding, shoring scaffolding towers, support scaffolding, prefabricated platforms, element supports, construction adjustment supports, set-up aids being construction elements, namely, braces, rails, pipe supports, upright signboards, slabs for building, beams, latches, latch bars, construction bracings, heads being shoring props in the nature of construction elements made of metal, namely, shores; scaffolding and its replacement parts, namely working and protective scaffolding, climbing scaffolding, modular scaffolding, scaffolding towers, scaffolding stair towers, working and loading platforms, prefabricated, of metal being parts of formwork and shoring systems, railings, namely, metal safety guardrails being parts of formwork systems and modular guardrail systems for temporary formwork structures, parapets being wall panels, mobile scaffolding, safety grids, namely grids placed under working platforms for safety, safety nets being retention wire nets; safety devices and their replacement parts, namely, protective shields being metal enclosures for high- rise formwork, collecting grids, namely, namely grids placed under working platforms for safety; transportable buildings and their replacement parts for formwork use; transport aids for the aforementioned goods, namely bins, containers, pallets, reusable containers; fittings for formwork, load-bearing and supporting structures, scaffolding, safety equipment, transportable buildings and transport aids, namely, profiles made of steel, iron, nickel, titanium and other metals and their alloys, tubes, anchors, brackets for building, cotters, metal nuts, metal anchor plates, metal tube clips, plugs, bolts, casings, formwork being scaffolding and its replacement parts for the manufacture of prefabricated components; all the aforementioned goods made of metal or predominantly of metalACTIVE—
007Formwork feeding system comprised of hydraulic form work feeders, lifting being lifting jacks other than hand-operated and hoisting devices being hoists for formwork scaffolding, for load-bearing and supporting structures, for scaffolding and for safety devices being protection screens, namely safety enclosures for high-rise formwork as well as their replacement partsACTIVE—
009Downloadable computer software, in particular sensory software being software for monitoring and analyzing data from temperature, load, and pressure sensors in construction formwork and shoring systems, application simulation software featuring instruction in construction manufacturing, virtual reality training simulation software in the field of formwork construction and scaffolding, planning and scheduling software for scheduling construction consultations, concrete monitoring software, namely, software for monitoring and controlling the quality of concrete in manufacturing processes, building information modeling (BIM) software, construction site project management software, manufacturing software being database management of manufacturing projects, computer-aided design (CAD) software for general use, electronic article surveillance (EAS) software and cloud computing software for database management; downloadable computer software for data processing in connection with construction services; sensors, in particular pressure, electric, temperature sensors; controllers and measuring devices for sensors, in particular electric sensors, pressure sensors, temperature sensors, formwork load sensors for measuring forces in formwork systems used in construction; digital temperature and safety indicators; digital transmitters; digital signs; electronic digital signboards; virtual reality computer hardware. all of the foregoing used in the construction industryACTIVE—
019Formwork being scaffolding and its replacement parts for concrete construction, namely wall formwork, sliding formwork, frame formwork, beam formwork, column formwork, single-sided formwork, composite formwork, circular formwork, slab formwork, ceiling tables, panel slab formwork, beam ceiling formwork, monolithic formwork, climbing formwork, self-climbing formwork, crane climbing formwork, platform climbing formwork, cooling tower formwork, shaft formwork, dam formwork, facade formwork, tunnel formwork, tunnel formwork carriages, bridge formwork, composite forming carriages; load bearing and support structures and their parts for formwork for concrete construction, namely beams, slabs; safety devices and their replacement parts, namely, protective shields being non-metal enclosures for high- rise formwork, collecting grids, namely, grids placed under working platforms for safety; all the aforementioned goods not made of metalACTIVE—
037Assembly, disassembly and rental of formwork being scaffolding, loadbearing and supporting structures being building platforms, scaffolding, safety devices being building platforms, transportable buildings, transport aids being building equipment, formwork scaffolding equipment as well as their replacement parts and of formwork replacement accessories; cleaning, maintenance, servicing, repair of scaffolding formwork, load-bearing and supporting structures being building platforms, scaffolding, safety devices being building platforms, transportable buildings, formwork scaffolding equipment and their replacement parts and of formwork replacement accessories; providing information and advice regarding the aforementioned services; construction consultancy in the field of formwork, load-bearing and supporting structures, scaffolding, safety devices and transportable buildings; installation and repair of measuring and testing equipment in the field of formwork, load-bearing and supporting structures, scaffolding, safety devices, transportable buildings and concrete; installation of equipment for processing digital signalsACTIVE—
042Engineering and technology consultancy services, namely planning, design and development of formwork, load-bearing and supporting structures, scaffolding, transportable buildings and transport aids; technical project planning in the field of design engineering formwork, load-bearing and supporting structures, safety devices and scaffolding; technical inspection services relating to the design of formwork, load-bearing and supporting structures, safety devices and scaffolding; technical environmental data analysis services in the field of formwork, load-bearing and supporting structures, safety devices and scaffolding; IT project management in the field of formwork, load-bearing and supporting structures, safety devices and scaffolding; industrial product safety testing of formwork, load-bearing and supporting structures, safety devices and scaffolding; research and development services in the field of concrete technology and construction processes; technical quality monitoring, testing and examination of concrete maturity; rental of software, namely software for inspecting, tracking and processing customer and project-specific data and documents in the field of formwork, load-bearing and supporting structures, safety devices and scaffolding; provision of online, non-downloadable software, namely, software for database management in the field of formwork, load-bearing and supporting structures, safety devices and scaffolding; computer-aided planning, design, engineering construction and design creation of construction projects; digital services, in particular providing on-line nondownloadable software and digital software applications supporting the design and use of formwork, load-bearing and supporting structures, safety devices and scaffolding and optimising construction operations in the planning, implementation, operation and demolition and disposal phase, as well as the related ability to obtain field data and general information; all of the foregoing used in the construction industryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 30, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 6, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 20, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 19, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 30, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 30, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 12, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 12, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 14, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 14, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 14, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 14, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 14, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 12, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 12, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 17, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 17, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 17, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 17, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 2, 2025RFNTREFUSAL PROCESSED BY IB—
Jul 11, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 11, 2025RFRRREFUSAL PROCESSED BY MPU—
May 19, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 18, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 30, 2025DOCKASSIGNED TO EXAMINER—
Feb 24, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 24, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 20, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance