USPTO serial 79417462
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Richard Y. Kim
Richard Y. Kim Snell & Wilmer L.L.P.One East Washington Street, Suite 2700Phoenix, AZ 85004-2556United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Testing apparatus for testing battery performance characteristics and performing evaluation testing of battery, namely, battery testers, electric energy test benches being equipment for battery testing and simulation, bi-directional electrical power supply units, electric simulation units for high voltage battery pack test units in the nature of high voltage battery pack testers, electronic apparatus for measuring and testing electrical loads, electronic data loggers, electric meters, electric inductance meters, electric capacitance meters, electric resistance meters, electric impedance meters, electric current testing meters, electric wavelength meters, electric frequency meters, electric frequency counters, electric voltage testers, electric amperage testers, electric power meters, and voltmeters; battery testing apparatus for testing and monitoring battery performance characteristics, namely, battery testers; load banks for power generator testing; load banks for uninterruptible electrical power supplies testing; load testing equipment for battery discharge testing, namely, load banks; performance evaluation test stations for fuel cells; electronic testing apparatus for testing wired and wireless transmission signals, signal strength and signal interference for use in the field of telecommunications; electronic data loggers; measuring or testing machines and instruments, namely, electric energy test benches being equipment for battery testing and simulation, bi-directional electrical power supply units, electric simulation units for high voltage battery pack test units in the nature of high voltage battery pack testers, electronic apparatus for measuring and testing electrical loads, electronic data loggers, electric meters, electric inductance meters, electric capacitance meters, electric resistance meters, electric impedance meters, electric current testing meters, electric wavelength meters, electric frequency meters, electric frequency counters, electric voltage testers, electric amperage testers, electric power meters, and voltmeters; electric power supply units comprising power supplies; structural replacement parts for electric power supply units, namely, electrical power supplies; electric power, voltage, current regulators; electric power supply regulators; DC power supplies; AC power supplies; switching power supplies; bi-directional power supplies; electronic loads, namely, load banks; electrical control, testing and monitoring apparatus for use in controlling, testing, and monitoring voltage and current, namely, voltage and electrical current testers, voltage and electrical current regulators, voltage and electrical current controllers, voltage and electrical current monitors, and voltage and electrical current stabilizers; electric current control devices; apparatus for controlling electric power supply units, namely, electrical controllers; power conversion devices, namely, electric power converters; electric power distribution units; rotary converters; phase modifiers; electric current meters and testers, magnetometers for tracking, measuring and monitoring voltage and current; electric cables and wires; electronic machines, devices and their parts, namely, electronic circuits, simulators comprising computer hardware, and emulators comprising computer hardware for testing batteries, motors, and inverters; downloadable computer software and firmware for controlling electrical power supply units; downloadable computer programs and software used to monitor, manage and control electrical power supply units, electronic loads, bi-directional power supply units, electric energy test benches for battery testing and simulation, for bi-directional electrical power supply units, electric simulation units for high voltage battery pack test units in the nature of high voltage battery pack testers, electronic apparatus for measuring and testing electrical loads, electronic data loggers; downloadable electronic publications in the nature of books, magazines, newsletters, articles and brochures in the fields of electronics, electric power distribution and electric power control; downloadable image files containing electronics and downloadable multimedia files containing video relating to electronics; pre-recorded video discs and videotapes featuring electronics; downloadable still images in the field of electronics and downloadable motion pictures featuring electronics | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 6, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 23, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 19, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 2, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 2, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 16, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 27, 2025 | CHPN | POST PUBLICATION AMENDMENT – NOT ENTERED | — |
| Dec 26, 2025 | APET | ASSIGNED TO PETITION STAFF | — |
| Dec 16, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 16, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 30, 2025 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Oct 28, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 28, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 22, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 28, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 22, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 22, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 22, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 8, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 23, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 23, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 29, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 28, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 23, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 14, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 13, 2025 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Feb 20, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |