USPTO serial 79417471
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patrick J. Smith
Patrick J. Smith Greer, Burns & Crain, Ltd.200 West Madison StreetSuite 2100Chicago, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Testing and measuring equipment for use in testing the performance of motor vehicles, namely, measuring and diagnostic equipment, not for medical purposes, for evaluating and analyzing the driving behavior of motor vehicles, as well as for the thermodynamic evaluation of internal combustion engines; testing and measuring equipment for use in testing the performance of motor vehicles and vehicle components, namely, test benches, testing machines, testing systems comprised of testing and measuring devices, control devices, simulators or computers for testing or measuring the drive technology and performance of motor vehicles, and scientific apparatus and testing instruments, all for testing vehicles, driver assistance systems comprised of electronic proximity sensors and switches, high-resolution cameras, integrated circuits for the purpose of imaging processing, and display monitors, vehicle components and drive train components, in particular combustion engines, electric machines, power electronics, batteries, fuel cells, electrically driven axles and transmissions; testing and measuring equipment for use in testing the performance of motor vehicles and vehicle components, namely, partially and fully automatic engine test benches; electronic monitoring devices and instruments for monitoring the operating condition of drive train components | ACTIVE | — |
| 042 | Technological research in the field of motor vehicles, namely, carrying out technical analyses and investigations into the influence of engine and exhaust aftertreatment components, data statuses of electronic control units (xCU), the influence of ambient conditions and various fuels and lubricating oils on the resulting particulate and general gaseous emissions, the influence of fuels and lubricating oils on exhaust emissions and on the abrasive and corrosive wear of engine components and the resulting particulate emissions, the overall behaviour, noise development and sound insulation of motor vehicles; technological research in the field of motor vehicles, namely, comparative evaluation of vehicles or vehicle components, in particular drive train components or vehicle characteristics, in particular drive train characteristics; technological research in the field of motor vehicles, namely, carrying out technical analyses and investigations of driver assistance systems; technological research in the field of motor vehicles, namely, carrying out technical analyses and investigations of electrified drives or drive train components, in particular combustion engines, electric machines, power electronics, batteries, fuel cells, electrically driven axles and transmissions | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 6, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 19, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 2, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 15, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 15, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 25, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 7, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 7, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 1, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 10, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 9, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 9, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 9, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 15, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 26, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 26, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 4, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 3, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 28, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 24, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 24, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 20, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |