USPTO serial 79417508
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Floating Offshore Wind Technology Research Associa
JP
Other trademarks owned by Floating Offshore Wind Technology Research Associa
Floating Offshore Wind Technology Research Associa
JP
Other trademarks owned by Floating Offshore Wind Technology Research Associa
Floating Offshore Wind Technology Research Associa
JP
Other trademarks owned by Floating Offshore Wind Technology Research Associa
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ee Ming T. Bahk
Ee Ming T. Bahk Oliff PLCP.O. Box 320850Alexandria, VA 22320-4850United States| Class | Description | Status | First use |
|---|---|---|---|
| 039 | Distribution of energy; distribution of renewable energy; distribution and transmission of electricity. | ACTIVE | — |
| 040 | Power generation related services, namely, processing and transforming of energy; production of electrical energy from renewable sources; production of energy; generation of electricity from wave energy; generation of electricity from wind energy; generation of electricity from solar energy; consultancy in relation to the production of electrical energy; production of wind-powered energy | ACTIVE | — |
| 042 | Provision of information concerning scientific research and conducting technical project studies relating to the use of natural energy; consultancy in the field of energy-saving, namely, consulting services related to the development of energy-saving technology; testing services for the certification of quality or standards, namely, product quality testing services and evaluating and testing the environmental qualities and impact of consumer products of others; testing or research on wind power generation, namely, wind power generator quality testing services and scientific research and technological research in the field of wind power generators; technological development on wind power generation, namely, development of new technology for others in the field of wind power generation; industrial research and design in the field of renewable power generation, transmission, and distribution technology; testing, study, and research, namely, product quality testing services and scientific research, all in the fields of power generation, civil engineering, thermal power generation, and applied electric power concerning power generation, transmission, and distribution; industrial research relating to power generation, transmission, and distribution plans or distributed power generation, and provision of information thereof | ACTIVE | — |
| 045 | Consultancy relating to the licensing of intellectual property; licensing of intellectual property rights; consultancy relating to intellectual property management; provision of information about intellectual and industrial property rights. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 6, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 20, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 19, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 9, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 20, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 20, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 2, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 2, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 2, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 14, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 14, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 8, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 15, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 15, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 15, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 15, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 19, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 1, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 1, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 30, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 29, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 19, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 19, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 18, 2025 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Feb 20, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |