USPTO serial 79418129
N
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 24, 2026
- Examiner
- SUTTON, CATHERINE ELIZABETH
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with N?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
G MATHEW LOMBARD
G MATHEW LOMBARD LOMBARD & GELIEBTER LLC1245 Farmington AvenueSTE 1334West Hartford, CT 06107Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Unprocessed composite carbon epoxy resins containing carbon nanotubes for industrial use, namely, vertically aligned carbon nanotube mats; Carbon composite materials consisting of a fibrous reinforcing structure made of carbon fibers and densified by a carbon matrix, for use in manufacturing, namely, nanostructured composite materials; polymer compositions used in the manufacture of commercial and industrial goods; nanotube polymeric membranes in chemical form for the separation of gas; nanoporous membranes in liquid chemical form for use in waterproofing; carbon nanotubes in the nature of carbon nanoparticles that photoluminesce for industrial purposes; organic compositions based on hollow or solid tubular nanostructures, namely graphene and carbon nanowires and nanotubes | ACTIVE | — |
| 009 | Electrodes not for medical use; anodes; cathodes; parts of electrical or distribution or energy conversion apparatus, namely, parts of apparatus that employs light concentrating optics to concentrate sunlight and to aid in the conversion of sunlight into electric and thermal energy; electric storage apparatus, namely, electrical storage batteries; electric cables; accumulators; electric resistances, electric capacitors; electric conductors; electrolyzers; chromatography apparatus for laboratory use; electric batteries; optical inspection apparatus and instruments; lasers; optical lenses; material for electricity mains, namely, components for electrical mains in the nature of cables, electric wires, connectors, circuit breakers, electrical adapters, plug connectors, power cables, electric cords, and electrical switches; photovoltaic cells; electric accumulators | ACTIVE | — |
| 042 | Research and development in the field of biotechnology, namely, nanostructures, nanomaterials and electric accumulator devices; technical studies and analyses in the field of biotechnology, namely, nanostructures, nanomaterials and electric accumulator devices; design and development of new products for third parties in the field of biotechnology, namely, nanostructures, nanomaterials and electric accumulator devices; Biotechnology research, namely, technical project studies in the field of biotechnology, namely, nanostructures, nanomaterials and electric accumulator devices; Biotechnology research, namely, testing of materials and products in the field of nanostructures, nanomaterials and electric accumulator devices | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 24, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 9, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 9, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 13, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 27, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 26, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 24, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 24, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 24, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 3, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 3, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 28, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 12, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 12, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 12, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 12, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 25, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 26, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 10, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 10, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 15, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 14, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 28, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 28, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 27, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |