Drawing for QUEST ONE

USPTO serial 79418576

QUEST ONE

Reviewed by CopyMark Law Group

Reg. 8090698Status 700Registered
Filing date
Status date
Registration date
Jan 6, 2026
Examiner
SHOOR, AMIT KUMAR
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with QUEST ONE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Edward M. Weisz

Edward M. Weisz COZEN O'CONNOR175 Greenwich Street, 55th Floor3 World Trade CenterNew York, NY 10007

Goods and services

ClassDescriptionStatusFirst use
007Machines for producing gas by electrolysis, namely machines for producing hydrogen by electrolysis being hydrogen production plants; machines for assembling electrolysers and hydrogen production systems, in particular cell stacks; machines for producing membranes for hydrogen production plants, in particular proton exchange membranes; separators being structural parts of hydrogen production plants; membranes for scientific apparatus being structural parts of hydrogen production plants; anodes, cathodes, electrodes as structural parts of hydrogen production plants; electrolysis cells as structural parts of hydrogen production plants * ; Machines for producing gas by electrolysis, namely hydrogen electrolysers; electrolyzers for hydrogen production *ACTIVE—
009Membranes for scientific apparatus, namely for electrolyzers for laboratory purposes; electrolysis cell apparatus for laboratory use; Downloadable computer software for the control and; remote maintenance of systems, namely electrolysers and hydrogen production systems; electrical integrated control systems for use with electrolysers and hydrogen production systems.ACTIVE—
011[ Machines for producing gas by electrolysis, namely hydrogen electrolysers; electrolyzers for hydrogen production ]SECTION 7(e) - CANCELLED—
037Installation, assembly, repair, maintenance and servicing of electrolyzers and hydrogen production plants; installation, assembly, repair, maintenance and servicing of electrolysis cell stacks; construction of plants for hydrogen production.ACTIVE—
042Engineering services, particularly technical project planning of electrolysers and hydrogen production plants; technical development of electrolyzers and hydrogen production plants as well as related hydrogen infrastructure; technical development of components of electrolysers for hydrogen and hydrogen production systems, namely water treatment systems, gas drying devices, water separation devices, gas compression devices, devices for the provision of electrical energy, devices for thermal management being cooling and heating devices, electrolysis cell stacks, membranes, separators, electrodes; technical development of systems for controlling the production of hydrogen in electrolyzers and hydrogen production plants; technical development of manufacturing and assembly systems for cell stacks of electrolyzers and hydrogen production systems; design and development of computer hardware and software for operating electrolyzers and hydrogen production plants; software development for electrolysers and hydrogen production systems; software as a service (SaaS) services featuring software for operating electrolyzers and hydrogen production plants; monitoring and control of electrolyzers and hydrogen production plants through remote access; information and advice regarding all of the above services.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 6, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 16, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 16, 2026FIMPFINAL DISPOSITION PROCESSED—
Jul 7, 2026NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Jun 17, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 17, 2026CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jun 17, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 17, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 6, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 8, 2026RINXUSPTO CORRECTION PROCESSED BY IB—
Jan 8, 2026CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jan 6, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 6, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 18, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 18, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 12, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 22, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 15, 2025CRSNCORRECTION SENT TO IB—
Oct 15, 2025CRCRCORRECTION CREATED FOR IB—
Sep 25, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 25, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 25, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 5, 2025RFNTREFUSAL PROCESSED BY IB—
Aug 19, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 19, 2025RFRRREFUSAL PROCESSED BY MPU—
Jul 16, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 15, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 8, 2025DOCKASSIGNED TO EXAMINER—
Mar 14, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 14, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 6, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance