USPTO serial 79418925
KGX
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 27, 2026
- Examiner
- KAPLAN, VALERIE ELIZABETH
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with KGX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul D. Bianco
Paul D. Bianco Fleit Intellectual Property Law21355 East Dixie HighwaySuite 115Miami, FL 33180Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Foundry machines; hydraulic controls for machines, motors and engines; industrial robots; refractory materials gunning machines; continuous casting machines and parts and fittings therefor; refractory nozzles for casting as part of casting machines; refractory sliding nozzles for casting as part of casting machines; sliding nozzle device for casting as part of casting machines; nozzle changer for casting as part of casting machines. | ACTIVE | — |
| 011 | Furnaces, other than for laboratory use; gas burners; kiln furniture; heating elements; hot plates; casting nozzles for furnaces; sliding nozzles for furnaces; nozzles for furnaces; sliding nozzle accessories for furnaces; casting nozzle exchangers for furnaces; porous plugs for furnaces for blowing gas into steel ladles or steel refining vessels; industrial furnaces; ceramic shelves as accessories for calcining kilns for industrial purposes; ceramic setters for industrial furnaces. | ACTIVE | — |
| 017 | Insulating materials; insulating refractory materials. | ACTIVE | — |
| 019 | Bricks; firebricks; fireclay; fireproof cement coatings; paving blocks, not of metal; refractory bricks, not of metal; refractory construction materials, not of metal; fired refractory materials, not of metal, for casting nozzles; refractory construction materials, not of metal, for casting nozzles; fired refractory materials, not of metal, for sliding nozzles; refractory construction materials, not of metal, for sliding nozzles; fired refractory materials, not of metal, for tundish; refractory construction materials, not of metal, for tundish; cement for furnaces; monolithic refractory being castables, gunning refractories, tap hole clay, ramming refractories, refractory mortar, plastic refractories, and injection refractories, not of metal; paving bricks; brick tiles. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Krosaki AMR Refractarios S.A.U.
- Other trademarks owned by KROSAKIHARIMA CORPORATION
- Other trademarks owned by Krosaki AMR Refractarios S.A.U.
- Other trademarks owned by Krosaki AMR Refractarios S.A.U.
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named KGX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 29, 2026 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Aug 20, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 5, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 5, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 23, 2026 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Apr 27, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 27, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 27, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 11, 2025 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 9, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 9, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 3, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 26, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 25, 2025 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 15, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 6, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 5, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 4, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 4, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 12, 2025 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Aug 2, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 15, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 15, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 23, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 22, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 14, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 13, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |