USPTO serial 79420487
Reviewed by CopyMark Law Group
Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Zahra Asadi
Zahra Asadi Nelson Mullins Riley & Scarborough LLP301 S. College Street, Suite 2300Charlotte, NC 28202United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; building materials of metal, namely, steel scaffolding, metal doors, metal hatches, and metal panels; transportable buildings of metal; metallic materials for railway tracks; non-electric cables and wires of common metal and steel; ironmongery and small items of metal hardware, namely, metal nails, screws, rivets, nuts, bolts, washers, hooks, shackles, screw rings, brackets, and threaded fasteners; pipework of metal; metal and non-metal safes; ores of metal; walkways in the nature of scaffolding of metal; all of the aforementioned goods for use in the nautical sector | ACTIVE | — |
| 007 | Machine tools, namely, lathes, power drills, winches, power blocks being electric pulley blocks, sheave blocks being electric pulley blocks, and metalworking machines tools; motors, other than for land vehicles; machine couplings and transmission components except for land vehicles; lifting and hoisting apparatus, namely, cranes, hoists, and derricks; all of the aforementioned goods for use in the nautical sector | ACTIVE | — |
| 037 | Construction services, namely, shipbuilding, offshore platform construction, and construction of steel structures for marine and industrial installations; machinery installation services; machinery maintenance and machinery repair; demolition services, namely, demolition of marine structures in the nature of oil and gas wells, offshore platforms, and bridges; drilling services, namely, offshore drilling of wells and drilling for dimensional stone in marine and offshore environments | ACTIVE | — |
| 042 | Engineering services, technological research, and engineering design, all provided in the fields of common metals and precious metal alloys for use in the nautical sector, metal building materials for use in the nautical sector, transportable buildings of metal for use in the nautical sector, materials of metal for railway tracks for use in the nautical sector, non-electric cables and wires for use in the nautical sector, metal fittings and small items of metal hardware for use in the nautical sector, pipes of metal for use in the nautical sector, safes for use in the nautical sector, walkways of metal for use in the nautical sector, machine tools for use in the nautical sector, motors and engines, except for land vehicles, for use in the nautical sector, couplings and transmission components, except for land vehicles, for use in the nautical sector, lifting cranes for use in the nautical sector, pulleys for use in the maritime sector, loading masts for the maritime sector, chrome ores, iron ores, cobalt ores, copper ores, chrome ores, tin ores, manganese ores, nickel ores, lead ores, tungsten ores, zinc ores, processed metal ores and metal ores | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 2, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 2, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 18, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 18, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 12, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 20, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 20, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 20, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 20, 2026 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 12, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 12, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 12, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 12, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 29, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 13, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 12, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 28, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 27, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 23, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 18, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 18, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 3, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |