Drawing for MECANA

USPTO serial 79421672

MECANA

Reviewed by CopyMark Law Group

Reg. 8319877Status 700Registered
Filing date
Status date
Registration date
Jun 30, 2026
Examiner
MCDORMAN, ROGER THOMAS
Law office
Historical data usage

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MECANA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert S. Broder

Robert S. Broder Collard & Roe, P.C.1077 Northern BoulevardRoslyn, NY 11576United States

Goods and services

ClassDescriptionStatusFirst use
007Filters as parts of water purification, water conditioning and water filtering machines, motors and engines.ACTIVE—
011Installations for water purification; water desalination installations; water-conditioning installations; water filtration installations; [ air and water filters for industrial and household purposes; ] devices for treating water, wastewater, drinking water and industrial water flows with filtration media made of natural and synthetic fabrics and cloths; systems for treating water, wastewater, drinking water and industrial water flows, consisting of basins, deflectors, valves, pumps, mechanical filters, gravity filters, synthetic and natural cloth filters, membranes, chain scrapers, mixers and regulating weirs for use in filtration and treatment installations for industrial and municipal water, wastewater, drinking water and industrial water flows.ACTIVE—
024Natural and synthetic filtering textile materials, namely, linen fibre fabrics, kenaf fibre fabrics, flax fibre fabrics, jute fibre fabrics, cotton fibre fabrics, raffia fibre being fabrics, hemp fibre being fabrics, silkpolypropylene (PP) fibre fabrics, viscose fibre fabrics, polyacrylonitrile (PAN) fibre fabrics, polyester (PES) fibre being fabrics, polyvinyl chloride (PVC) fibre fabrics, polycarbonate (PC) fibre fabrics, polyethylene terephthalate (PET) fibre fabrics, polyimide (PI) fibre fabrics, polytetrafluoroethylene (PTFE) fibre fabrics, polyamide (PA) fibre fabrics, polyethylene (PE) fibre fabrics, polymethyl methacrylate (PMMA) fibre fabrics, polyoxymethylene (POM) fibre fabrics, polyvinylidene fluoride (PVDF) fibre fabrics, polybutylene terephthalate (PBT) fibre fabrics, polyetherketone (PEK) fibre fabrics, polyamideimide (PAI) fibre fabrics, polyetheretherketone (PEEK) fibre fabrics, polyphenylsulfone (PPSU) fibre fabrics, polyphenylene sulfide (PPS) fibre fabrics, polycarbonate (PC) fibre fabrics, styrene-acrylonitrile copolymer (SAN) fibre fabrics, acrylonitrile-butadiene-styrene copolymer (ABS) fibre fabrics, syndiotactic polystyrene (SPS) fibre fabrics, polyurethane (PUR) fibre fabrics, mineral fibres in the nature of basalt fibres fabrics, glass fibres fabric, glass fibre fabrics and aramid fibre fabrics being fabrics for treating water, wastewater and industrial water flows, as well as for conditioning of drinking waterACTIVE—
037Installation, repair and maintenance of septic installations; installation, repair and maintenance of water purification apparatus; installation, repair and maintenance of devices and systems for treating water, wastewater, drinking water and industrial water flows.ACTIVE—
042Technical design and technological planning of septic installations; technical and technological planning and design of water purification plants; technical design and technological planning of devices and systems for treating water, wastewater, drinking water and industrial water flows.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 3, 2026LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Nov 2, 2026COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Nov 2, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 1, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 30, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 16, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 16, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 30, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 30, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 12, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 12, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 7, 2026GPNXNOTIFICATION PROCESSED BY IB—
May 6, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 22, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 22, 2026OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 10, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 10, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Apr 10, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 10, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 10, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 20, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 20, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 20, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2025RFNTREFUSAL PROCESSED BY IB—
Sep 3, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 3, 2025RFRRREFUSAL PROCESSED BY MPU—
Jul 20, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 19, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2025DOCKASSIGNED TO EXAMINER—
Jun 6, 2025LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Apr 25, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 25, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 17, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance