Drawing for STEP

USPTO serial 79422361

STEP

Reviewed by CopyMark Law Group

Reg. 8200327Status 700Registered
Filing date
Status date
Registration date
Apr 7, 2026
Examiner
OH, WON TEAK
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with STEP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Keith A. Weltsch

Keith A. Weltsch Scully, Scott, Murphy & Presser, P.C.400 Garden City PlazaSuite 300Garden City, NY 11530

Goods and services

ClassDescriptionStatusFirst use
009Scientific research and laboratory apparatus, educational apparatus and simulators for nuclear fusion and for use in nuclear reactors; scientific apparatus and instruments for nuclear fusion and for use in nuclear reactors; scientific, research, surveying, photographic, audiovisual, optical, weighing, measuring, signalling, detecting, testing, inspecting, and teaching apparatus and instruments for nuclear fusion and for use in nuclear reactors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; magnets; electromagnets; apparatus containing superconductive magnet assemblies; energy control devices for controlling energy usage for nuclear reactors; electric control devices for energy management; apparatus for monitoring electrical energy consumption; downloadable computer software for energy management and energy measurement; downloadable computer software for analysing and managing nuclear reactors and nuclear facilities; all of the aforesaid goods in relation to fusion energyACTIVE—
011Nuclear reactors; nuclear generators; nuclear installations namely, nuclear power plants, nuclear generators and nuclear fusion reactors; nuclear power plant installations; nuclear generators, namely tokamaks in the nature of a machine using magnetic fields for generating nuclear energy; installations for processing nuclear fuel and nuclear moderating material in the nature of nuclear power plants, nuclear generators and nuclear fusion reactorsACTIVE—
037Construction of nuclear reactors, nuclear facilities, and nuclear fusion plants; building construction services; construction of industrial buildings; heavy engineering construction, namely, construction of nuclear reactors, nuclear facilities, and nuclear fusion plants; construction of nuclear reactors; construction of nuclear power plants; servicing, namely maintenance and repair of nuclear plants; cleaning of nuclear plants; repair and maintenance of nuclear power plants; providing information relating to the repair or maintenance of nuclear power plants; building construction information; provision of construction advice; construction consultancy; construction project management services; construction planningACTIVE—
040Generation of energy; energy production; production of energy by nuclear power plants; generation of electricity from nuclear fusion; electricity generation; processing of nuclear fuels; treatment of radioactive and other hazardous wastes; providing information in the field of nuclear energy production; provision of information, advice and consultancy in relation to the production of nuclear energy, and the treatment of radioactive and other hazardous wasteACTIVE—
042Scientific research and analysis in the field of nuclear energy; scientific research in the field of nuclear energy power generation technology; scientific research and analysis in the field of nuclear fusion energy; scientific and technological services, namely scientific research and design in the field of plasma physics; engineering research; engineering research in the field of design, development and construction of nuclear power plants; engineering services for the design of structures; industrial design; engineering design; design of industrial plants; engineering and industrial design of nuclear power plants; nuclear engineering services; consultancy services relating to nuclear engineering; preparation of scientific reports relating to commissioning of nuclear units; construction project services, namely construction drafting, design and planning of nuclear power plants; design and development of nuclear power plants; design and development of tokamak fusion power devices for energy production; design and development of high temperature superconducting magnets; design and development of energy distribution networks; design and development of energy management and energy measurement software; design and development of computer software for analysing and managing nuclear reactors and nuclear facilities; scientific research consultancy in the field of nuclear energy; providing scientific information in the field of nuclear energy; all of the aforesaid services in relation to fusion energyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 1, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 23, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 23, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 14, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 14, 2026FIMPFINAL DISPOSITION PROCESSED—
Jul 7, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 7, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 7, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 17, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 17, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 11, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 26, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 12, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 12, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 11, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 26, 2025RFNTREFUSAL PROCESSED BY IB—
Jul 10, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 10, 2025RFRRREFUSAL PROCESSED BY MPU—
May 15, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 14, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 7, 2025DOCKASSIGNED TO EXAMINER—
Apr 25, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 25, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 24, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance