Drawing for EXENTIAL

USPTO serial 79422418

EXENTIAL

Reviewed by CopyMark Law Group

Reg. 8362499Status 700Registered
Filing date
Status date
Registration date
Jul 28, 2026
Examiner
PERKINS, ELLEN J
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with EXENTIAL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephen B. Schott

Stephen B. Schott Schott, P.C.1055 Westlakes Dr., Ste 300Berwyn, PA 19312United States

Goods and services

ClassDescriptionStatusFirst use
006Metal Pipes, metal pipes coated with protective impregnating agents, industrial metal hoses and accessories, namely, valves of metal, other than parts of machines; metal pipes that are coated with protective impregnating agents; metal ventilation ducts, coated with protective impregnation agents; pipe fittings being junctions of metal; manifolds of metal for pipelines; metal valves for controlling the flow of gases in pipelines coated with protective impregnating agents; metal valves for regulating the flow of liquids in pipelines coated with protective impregnating agents; containers of metal for chemicals, compressed gases and liquids; metal containers, namely, ampoules and vessels for storing and transporting liquid and gaseous chemicals, chemical compounds, chemical precursors, chemical products and high-purity and ultra- high-purity gasses to a process instrument or a supply or conductor system for use in the electronics, semiconductor and microelectromechanical industries, battery cell manufacturing, pharmaceutical industry, biotechnology as well as in data and high-performance data centersACTIVE—
007Material production and processing machines, namely, machines for cutting and forming metal to pipes, ducts, cabinets and ceiling grids; process frames as accessories for machines and mechanical equipment for use in the development and manufacture of biopharmaceuticals; filtering machines for chemical processing, centrifugal and centrifuges; filter housings being parts of machines; bioreactors for use in manufacturing biopharmaceuticals; electromechanical marking machines for use in the chemical industry; blending machines for chemical processing; pneumatic pumps for the supply of liquefied gases; pneumatic tube conveyors; plastics pipes being fitted parts of machines; chemical process equipment, namely filtration systems comprised of, electric pumps, metal tubing, membrane filtration units, filters being parts of machines and electronic controllers therefor, for tangential flow filtration, depth filtration, nano filtration, and in-line dilutionACTIVE—
009Electronic apparatus and instruments for control, regulation and monitoring of heating, air conditioning and ventilation systems for use in clean room systems and for building control technology; chromatography apparatus for laboratory use; measuring, detection, dosing, monitoring and control devices for gas supply in manufacturing and production processes; measuring, detection, dosing, monitoring and control devices for chemical supply; level indicators; oil, liquid, solid and gaseous level sensors; level sensors and control devices for gas and chemicals, namely sensors for measuring gas and chemical levels, and for measuring discrete liquid levels in ampoules used in the semiconductor industry, and electronic controllers therefore; temperature measuring instruments to measure temperature in inlet and outlet airflows of air conditioning units, clean rooms and climate chambersACTIVE—
011Electric fans, filters for commercial air purification, air filter-fan units, ceiling lights, ventilation units for air conditioning and air conditioning units, each adapted for use in grid ceilings, walls, floors, cover plates and partition walls in clean rooms, climate chambers, clean room ceilings, rotary locks and tunnel locks; heating and air conditioning installations as parts of building technology installations; air cooling, air heating and air ventilation apparatus; air conditioning apparatus and installations; dust, solvent vapour and oil mist extraction and separation apparatus, namely air purification and air filtration installationsACTIVE—
037construction, installation and assembly relating to the installation of process engineering systems air conditioning technology systems, clean room technology systems, building technology systems, electrical engineering systems, supply technology systems, disposal technology systems, environmental control systems, building automation systems, and media connection systems for data centers and high-performance data centers; maintenance, repair and cleaning of semiconductor factories, data centers and high-performance data centers; construction, assembly, and installation work, namely, the construction of semiconductor factories, data centers and high-performance data centers, and factories in the food industry, pharmaceutical industry, biotechnology and battery cell production industries; installation, repair and maintenance of computer rooms, data centers and control centers; assembly services relating to the installation of computer hardware in setting up computer rooms, data centers and control centers; installation of computer rooms, data centers and control centers; installation and assembly services relating to the installation of heating, cooling, air conditioning, drying, ventilation, extraction and separation systems and equipment; maintenance, inspection services in the course of building construction, and repair of heating, cooling, air conditioning, drying, ventilation, extraction and separation systems and equipment; installation and assembly services relating to the installation of environmental control systems and equipment to retrofit existing factories; repair of gas supply systems; repair or maintenance of chemical plants; installation of gas supply and distribution apparatus; maintenance and repair of pipeline systems; painting of metal surfaces to prevent corrosion or coating; pipe installation services; installation and assembly services relating to the installation of modularized clean rooms, modularized heating, ventilation and air conditioning installations (HVAC), modularized air filtration and dust extraction apparatus, modularized electrical supply installations, and modular process utilities in the nature of pipe spools, laterals and skidsACTIVE—
042Technical project planning in the nature of engineering services for the construction of building and process engineering systems for air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, disposal technology, environmental control, automation, media supply, and for data centers and high-performance data centers; carrying out technical inspections of heating, cooling, air conditioning, drying, ventilation, extraction and separation systems and equipment to ensure the legally required functionality; technical inspection services for heating, cooling, air conditioning, drying, ventilation, extraction and separation installations and devices relating to the functionality of building technology systems, and the technical production and work processes; technical consulting and technological planning in the nature of engineering services for the implementation of work and production activities or processes in the field of microelectronics, biotechnology, battery cell manufacturing, pharmaceutical and food industries as well as for data centers and high-performance data centersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 28, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 8, 2026OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 23, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 23, 2026OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 28, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 28, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 9, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 9, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 4, 2026GPNXNOTIFICATION PROCESSED BY IB—
Jun 3, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 20, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 20, 2026OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 11, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 10, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 10, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 10, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 23, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 23, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 23, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 24, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 24, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 24, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 18, 2025RFNPREFUSAL PROCESSED BY IB—
Nov 24, 2025GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 24, 2025GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 24, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 27, 2025DOCKASSIGNED TO EXAMINER—
Oct 10, 2025RFNPREFUSAL PROCESSED BY IB—
Oct 1, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 1, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 1, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 21, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 21, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2025RFNTREFUSAL PROCESSED BY IB—
Jul 12, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 11, 2025RFRRREFUSAL PROCESSED BY MPU—
May 18, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 17, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 7, 2025DOCKASSIGNED TO EXAMINER—
Apr 30, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 30, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 24, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance