USPTO serial 79422649
ZERO-E
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- BARRETT, LEAH N
- Law office
- TMEG LAW OFFICE 106
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with ZERO-E?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction; construction of public works; construction work management (supervision); installation of temporary structures for outdoor events; assembly of formworks for civil engineering construction; repair or maintenance of construction machines and apparatus; supervision of buildings during construction; building repair work; land excavation; site preparation being construction services; paving services; sealing buildings; on-site construction supervision of civil engineering structures; rental of construction and building equipment; rental of construction machinery; consultancy relating to the supervision of the construction of buildings; construction of geothermal energy installations; installation of apparatus for production of electrical energy; installation of wind-power systems; installation of solar energy systems; maintenance, overhaul and repair of electrical energy production apparatus and installations; maintenance and repair of energy production installations; project supervision for construction of civil engineering structures. | ACTIVE | — |
| 040 | Production of energy; consulting in connection with electrical energy generation; electrical energy generation; generation of electrical energy from renewable energy sources; waste treatment [transformation]. | ACTIVE | — |
| 042 | Technical advice in connection with energy-saving measures; technological analysis regarding third-party energy and electricity needs; energy auditing; consultancy concerning technological services in the field of power supply and electricity; development of energy and electricity management systems; design and development of renewable energy generation systems; design and development of energy distribution networks; research in the field of energy; advisory services relating to energy consumption; technological consultancy services in the field of alternative energy generation; civil engineering planning services; research and development services in the field of engineering; engineering; preparing plans with respect to construction; technical project studies; provision of information regarding research and technical project studies relating to the use of natural energy. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 15, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 1, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 1, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 27, 2026 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Mar 27, 2026 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Oct 3, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 13, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 12, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 2, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 1, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 29, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| May 2, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 2, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 1, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |