USPTO serial 79424272
DAM EASY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 14, 2026
- Examiner
- BLAZICH, JOAN MICHELE
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with DAM EASY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Monique A. Morneault
Monique A. Morneault Scherrer Patent & Trademark Law, P.C.17 E. Crystal Lake Ave.Crystal Lake, IL 60014United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Scientific measuring, signalling, detecting, testing, inspecting, apparatus and instruments, namely, water level sensors, flood detection sensors, water flow measuring instruments and electronic signalling apparatus being signal processors and alarm apparatus for detecting flood conditions; apparatus and instruments for recording, transmitting, reproducing or processing sound, images or data; measuring, detecting, monitoring and controlling devices, namely, water sensors and detectors and monitoring systems comprised of water flow sensors and detectors for use with flood barrier apparatus and instruments; sensors, detectors and monitoring instruments, namely, water sensors and detectors, leak detectors for water and water leak alarm monitoring systems; pressure measuring apparatus; devices for monitoring, evaluating and reporting the efficacy and integrity of flood barrier apparatus and instruments, namely, water and pressure sensors and leak detecting devices for water consisting of water sensors and water valves; downloadable computer software for monitoring and analysing water sensors and monitoring and controlling electronic alarm devices for use with flood barrier apparatus and instruments; computer hardware; computer peripheral devices; downloadable and recorded software for monitoring and analysing water sensors and monitoring and controlling electronic alarm devices for use with flood barrier apparatus and instruments; downloadable and recorded software for use in monitoring, evaluating and reporting the efficacy and integrity of flood barrier apparatus and instruments; downloadable and recorded software for reporting weather alerts | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by All Weather Industries Limited
- Other trademarks owned by All Weather Industries Limited
- Other trademarks owned by All Weather Industries Limited
- Other trademarks in Class 009
- Similar marks named DAM EASY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 5, 2026 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 21, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 21, 2026 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 14, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 14, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 14, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 26, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 26, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 20, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 7, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 1, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 30, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 30, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 30, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 30, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 17, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 17, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 29, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 17, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 21, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 21, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 6, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 5, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 27, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 2, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 2, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 28, 2025 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| May 22, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |