USPTO serial 79425181
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machine tools for stamping, bending and molding metal, aluminum, copper, plastic, elastomer and composite material; tools for machine tools, namely, power-operated center punches, screwdriver bits being parts of air powered tools, grippers being parts of metalworking machine tools, machining centering units for metalworking; machines and machine tools for treatment of materials and for manufacturing, namely, machines and machine tools for laser cleaning and surface treatment machines for use in assembly, namely, automatic assembly and testing lines, assembly line conveyors; assembly line conveyors and conveyor belts; linking mechanisms being parts of machines, namely, servo motor driven linear and rotary table transport mechanisms for moving metal, plastic, elastomer, copper, aluminum and composite materials on assembly lines and subassemblies on assembly lines and workpiece carrier; machine guides being parts of machines; holding devices specially adapted for machine tools; machine tools, namely, clamping devices for use with machine tools for holding piece parts on machine tool tables; guidance frameworks for machine tools, being parts of machines; precision machine tools for cutting materials; precision machine tools for cutting workpieces; metal finishing plant, namely, machines for finishing metals; direct current motors; rotary brushes for machines; workpiece slide tables being parts of machines; workpiece slide tables being parts of machines; machine tool holders; feeding machines; conveyors machines | ACTIVE | — |
| 009 | Downloadable computer operating systems; computer software, recorded for optimization of assembly line machines, and operating assembly line machines, MES system; computer peripheral devices; transmitter receivers for use with industrial automation equipment; electronic control systems for motors; downloadable industrial automation software for engineering and programming of PLC (programmable logic controller) and IPC (industrial PC) for use in metal working assembly lines; downloadable computer programs for data processing; downloadable software for automation of industrial assembly machines; direct current converters; current convertors; electronic connections, namely, electrical plugs, sockets and other electric contacts; batteries for electric vehicles; batteries; downloadable machine control software; downloadable logistics software; downloadable communications processing computer software; intelligent gateways for real-time data analysis, namely, bus systems; downloadable intelligent character recognition (ICR) software; downloadable machine learning software; downloadable machine learning software for analysis of vision system, laser welding, screwing and pressing processes; downloadable artificial intelligence software for healthcare for vision system, laser welding and dosing systems processes; downloadable artificial intelligence software for process optimization; downloadable software for monitoring, analyzing, controlling and running physical world operations for use in automated production; downloadable industrial process control software; downloadable production support software | ACTIVE | — |
| 012 | Electric motors for motor cars; gearboxes for motor cars. | ACTIVE | — |
| 037 | Repair of industrial machinery; installation of industrial assembly plants; machinery installation, maintenance and repair; assembling of machine plants, namely, installation of machine plants. | ACTIVE | — |
| 042 | Technical engineering; computer software development; development of industrial machinery; maintenance and updating of computer software; software as a service (SaaS) featuring software for automation of industrial assembly machinery; platform as a service (PaaS) featuring software for automation of industrial assembly machinery; conducting technical project studies, namely, technical research in the field of industrial automation; mechanical engineering research; design and development of computer software for logistics; computer programming services for the analysis of data; technical data analysis services; creation, maintenance and adaptation of software; development of computer programs; design services for data processing systems; development of programmes for data processing; research and development services; product development; technical consultancy relating to product development; information technology (IT) support services, namely, troubleshooting of computer software; installation of computer software; installation, repair and maintenance of computer software; installation of database software. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 2, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 2, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 14, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 14, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 8, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 20, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 20, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 20, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 20, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 20, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 29, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 29, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 29, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 21, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 21, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 21, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 5, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 18, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 18, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 11, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 10, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 10, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 6, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 6, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 5, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |