USPTO serial 79426199
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Protective clothing, namely, body armour; body armour; bullet-proof clothing; bullet-proof vests; protective body armour vests; protective ballistic resistant and blast resistant body armour; protective load bearing vests reinforced with ballistic armour for holding tactical equipment; protective body armour clothing made from ballistic resistant materials; protective body armour, namely, ballistic, bullet, blast, slash and stab resistant clothing; protective helmets; non-medical protective face masks for the prevention of accident or injury | ACTIVE | — |
| 012 | Armoured vehicles; armoured land vehicles; armoured bodies for vehicles; blast resistant and projectile resistant land vehicle doors and vehicle body panels for absorbing the impact of projectiles and explosive; military vehicles for transport; doors panels for land vehicles; vehicle doors; land vehicle structural frames; roof panels for land vehicles; all-terrain vehicles (ATVs); utility terrain vehicles (UTVs); personal watercraft, namely, small powerboats, personal jet boats, water scooters; motorized personal mobility scooters; boats and structural parts therefor; motorized gliders; utility transportation land vehicles | ACTIVE | — |
| 019 | Armour-plating, not of metal, for building; armoured doors, not of metal; armoured windows having non-metallic frames; non-metal barrier construction materials, namely, protective blast resistant and projectile resistant blocks, plates, panels, tiles, and wallboard of fiberglass and polyester resin composite used in the construction of flooring, doors, roofing, and pre-fabricated walls for absorbing the impact of projectiles and explosives | ACTIVE | — |
| 035 | Retail store services and online retail store services in the field of protective ballistic resistant and blast resistant body armour, protective helmets, ballistic resistant and blast resistant vehicles, ballistic resistant and blast resistant materials for vehicles and buildings, protective ballistic resistant and blast resistant inserts for body armour, vehicles, body armour accessories, namely, bags for storing body armour and protective helmets; business administration of consumer loyalty programs; wholesale store services and wholesale distributorship services in the field of protective ballistic resistant and blast resistant body armour, protective helmets, ballistic resistant and blast resistant vehicles, ballistic resistant and blast resistant materials for vehicles and buildings, protective ballistic resistant and blast resistant inserts for body armour, vehicles, body armour accessories, namely, bags for storing body armour and protective helmets | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 29, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 29, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 17, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 17, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 17, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 27, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 27, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 21, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 2, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 29, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 29, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 18, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 5, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 17, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 16, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 9, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 8, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 8, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 23, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 23, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 19, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |