Drawing for CO2OLTEC

USPTO serial 79426228

CO2OLTEC

Reviewed by CopyMark Law Group

Status 645Office Action
Filing date
Status date
Registration date
Examiner
SEVERSON, JUSTIN
Law office
TMO LAW OFFICE 111

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 645: Status 645 means the USPTO mailed a final refusal maintaining at least one objection to your application. You can respond, appeal to the Trademark Trial and Appeal Board, or allow the application to abandon.

Need help with CO2OLTEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Electric compressors being components for heat pumps; Electric compressors being components for heating systemsACTIVE
011Cooling installations comprised of air cooling apparatus for industrial use; Freezing installations comprised of commercial refrigerators and freezers and replacement parts and fittings therefor; Refrigeration units, namely, commercial refrigerators and freezers and replacement parts and fittings therefor; Electric cooling fans; Cooling units for industrial purposes; Dryers for cooling systems, namely, drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; Air-conditioning apparatus and installations for industrial use; Refrigerating display cabinets; Heating units for industrial purposes; Central heating installations; Solar energy powered heating installations; heat storage [solar] equipment for heating; heat exchangers, evaporators and pipe systems being components for heating systems; heat pumps; heat exchangers and controllers being components for heat pumps.ACTIVE
035Business consultancy; wholesale store services featuring refrigeration equipment, cooling installations, freezing installations, commercial refrigeration units, cooling fans, cooling installations, dryers for refrigeration systems, industrial refrigeration systems, refrigerated displays, refrigerated storage systems, air-conditioning equipment and energy-efficient refrigeration systems, heating, ventilation, air-conditioning and purification systems, HVAC systems for heating, ventilation, and air-conditioning, heating elements and wires, heating installations, industrial heating installations, central heating installations, solar heating installations, heat storage equipment for heating, heat controllers being parts of heating installations, compressors, heat exchangers, evaporators and pipe systems being parts of heating installations, heat pumps, compressors, heat exchangers and controllers being part of heat pumps, solar heating installations, heat installations, energy management systems, thermal management systems, industrial energy systems, as well as related industrial thermal systemsACTIVE
037Installation and maintenance of cooling installations, freezing installations, cooling equipment, refrigeration units, cooling fans, cooling systems, dryers for cooling systems, industrial cooling systems, refrigerated displays, refrigerated storage systems, air-conditioning equipment, heating, ventilation, air-conditioning and purification systems, HVAC systems for heating, ventilation and air-conditioning, heating elements and wires, heating installations, industrial heating installations, central heating installations, solar heating installations, heat storage equipment for heating, heat controllers being parts of heating installations, compressors, heat exchangers, evaporators and pipe systems being parts for heating installations, heat pumps, compressors, heat exchangers and controllers being parts of heat pumps; installation and maintenance of solar thermal systems; installation and maintenance of heating installations; thermal insulation of buildings; Installation of insulation in buildings by using the thermal properties of the structures; installation and maintenance of energy management systems; installation and maintenance of thermal management systems; installation and maintenance of industrial energy systems for optimizing energy efficiency inside buildings.ACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 20, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
May 20, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 20, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 29, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 29, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 29, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2025RFNTREFUSAL PROCESSED BY IB
Nov 10, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 9, 2025RFRRREFUSAL PROCESSED BY MPU
Sep 23, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 22, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2025DOCKASSIGNED TO EXAMINER
Sep 3, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 3, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Sep 3, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Sep 3, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Jun 23, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Jun 23, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 19, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance