USPTO serial 79428064
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely, protective grills, bike hoops, street furniture, planters, walkway components, namely, gratings, walkway finishes, walkway drainage components and systems, walkway guardings, walkway handrails, walkway screens, privacy screens, property separation screens, walkway barriers, access gates; metal balustrades; metal balconies; metal handrails; metal doors and gates and frames and structures therefor and for windows; metal staircases; metal tension wires; metal midrails; metal vertical rails; metal infill panels being metal building panels; metal canopies; bespoke metalwork products in the nature of protective grills, bike hoops, street furniture, planters, walkway components, namely, gratings, walkway finishes, walkway drainage components and systems, walkway guardings, walkway handrails, walkway screens, privacy screens, property separation screens, walkway barriers, access gates; enhancements, connectors, structural and replacement parts and fittings for the aforesaid | ACTIVE | — |
| 019 | Non-metallic building materials, namely, balustrades, balconies, handrails, windows and doors, gates, staircases and building panels; wooden balustrades; wooden balconies; wooden handrails; wooden windows and doors; wooden midrails; wooden vertical rails; structural glass panels for building construction purposes; laminated glass panels for building construction purposes; glass walling for building construction purposes; glass infill panels for building construction purposes; non-metallic canopies for building construction purposes, including glass canopies; enhancements, connectors, structural and replacement parts and fittings for the aforesaid | ACTIVE | — |
| 037 | Building design services; building construction and installation services being installation of balconies; project management of construction and installation being construction project management services; structural assessment of building designs in the nature of consulting in the field of building construction, balcony construction and installation; quality assessment of building design, construction and installation services in the nature of consulting in the field of building construction, balcony construction and installation; information, advisory, and consultancy services in relation to all of the aforesaid in the nature of consulting in the field of building construction, balcony construction and installation | ACTIVE | — |
| 042 | Project management of building design in the nature of consulting services in the field of product design and development; project management of building design in the nature of consulting of the process, sequencing and method in which buildings are constructed; information, advisory, and consultancy services in relation to all of the aforesaid in the nature of consulting services in the field of product design and development; information, advisory, and consultancy services in relation to all of the aforesaid in the nature of consulting of the process, sequencing and method in which buildings are constructed | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 24, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 30, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 10, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 10, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 23, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 22, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 4, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 4, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 17, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |