USPTO serial 79428124
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Automated and robotic production machines and lines composed thereof for assembling roof trusses, floor trusses and wall elements; industrial robots | ACTIVE | — |
| 009 | Downloadable computer software used to control automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; cad drawing files for roof trusses in downloadable form; downloadable cloud computing software for designing trusses in the field of building component manufacturing industry; downloadable cloud computing software for controlling automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; computer hardware modules for use in electronic devices using the Internet of Things (IoT); data collection apparatus in the nature of a data processing apparatus; data collection apparatus being data processing equipment; data processing apparatus and data processing systems comprised of data processing apparatus; motion sensors; downloadable robotic process automation (RPA) software; downloadable application software for database management for use in cloud computing services; downloadable application software used to control automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; downloadable cloud computing software for database management in the field of analytics; downloadable cloud computing, namely, computer-aided design (CAD) software in the field of truss design | ACTIVE | — |
| 040 | Custom construction being manufacture of truss manufacturing machines and apparatus in the field of mechanical engineering | ACTIVE | — |
| 042 | Providing online non-downloadable computer software used to control automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; design of roof trusses, floor trusses, and wall elements; graphic illustration and drawing services, namely, providing drawings of roof trusses, floor trusses, and wall elements, and converting them to electronic cad drawing; software as a service (SaaS) services featuring software for controlling manufacturing machines and designing trusses for use in the building component manufacturing industry; software as a service (SaaS) services featuring software for controlling automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; platform as a service (PaaS) services featuring software platforms for designing trusses for use in the building component manufacturing industry; platform as a service (PaaS) services featuring software platforms for controlling automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; cloud computing featuring software for controlling automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; engineering services relating to robotics; software installation; technological consultancy related to roof trusses, floor trusses and wall elements production equipment and assembly lines; technological consultancy related to control automated and robotic manufacture of roof trusses, floor trusses and wall elements production equipment and assembly lines; engineering services relating to automation and robotics; software development; design and development of data processing programs; technical data analysis services for scientific and engineering purposes; computer programming services for the analysis of data; cloud computing consultancy services in the field of analytics; cloud computing consultancy services in the field of truss design | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 12, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 12, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 12, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 24, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 24, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 18, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 27, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 25, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 25, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 25, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 25, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 19, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 19, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 19, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 11, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 26, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 26, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 10, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 9, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 8, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 18, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 18, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 17, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |