USPTO serial 79428505
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Materials, not of metal, for building and construction, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; mouldings, not of metal, for building, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels; plastic mouldings for building construction, namely, wall forms and panels; plastic articles for use in building, namely, wall forms, panels, and floor boards; plastic panels for use in building; preformed building panels made of concrete and plastic; non-metallic structural building elements, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; prefabricated non-metallic building constructions, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; prefabricated non-metallic building components, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; building panels, not of metal, namely, concrete and plastic building panels; non-metallic cladding for buildings, namely, concrete and plastic cladding panels; building elements of concrete, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; articles of concrete for construction purposes, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; architectural concrete products for building purposes, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete products for use in building, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete; concrete prefabrications, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete panels; concrete building panels; concrete cladding panels; preformed building panels made of concrete; preformed building panels made principally of concrete; preformed concrete building elements, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; precast concrete building elements, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; non-metal nail plates being component parts of non-metal roof trusses; non-metallic roof trusses; non-metallic building materials for roofs, namely, roof trusses; rigid structure joint connectors, not of metal, for building and construction purposes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 23, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 23, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 5, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 5, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 30, 2026 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 29, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 16, 2026 | RFNP | REFUSAL PROCESSED BY IB | — |
| Apr 15, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 15, 2026 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 3, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 2, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 2, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 2, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 17, 2026 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2026 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 12, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 12, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 12, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 3, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 15, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 15, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 5, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 4, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 1, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 31, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 31, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 24, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |