USPTO serial 79428626
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
CH
CH
CH
CH
CH
CH
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electrical controlling devices; electrical connection boxes; electric sockets; electric current switches; electric circuit switches; electric control panels; electric connectors; electrical switches; electrical fuses; circuit breakers; electric conductors; electrical distribution systems, namely, power distribution panels; electrical power distribution blocks; electrical outlets; electric and electronic circuits; electrical connections; distribution boxes for electrical power; electrical integrated control systems for use in the field of intercom communications and security monitoring; electrical circuits; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; electric control devices for energy management; charging stations for electric vehicles; security control panels and motion detectors; fire and smoke detectors; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; recorded and downloadable software for configuring electrical circuitry, electrical connections, and apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current | ACTIVE | — |
| 042 | Scientific and technological services and research and design relating thereto, namely, product design and development in the field of electrical energy management; Industrial analysis, industrial research and industrial design services in the field of electrical energy management; design and development of computers and software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 11, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 11, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 23, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 17, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 28, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 10, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 10, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 10, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 30, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 10, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 10, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 23, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 22, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 18, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 5, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 5, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 5, 2025 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 24, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |