USPTO serial 79429221
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal, namely, framing, beams, walls, wall sheeting, doors, building trims, ceilings, floors, roofs, telescopic framing for buildings, metal wall panels, trusses for roof and floor, structural framing; construction materials made of metal, namely, structural steel; rivets of metal; connectors of metal, namely, connectors for connecting sections of telescopic steel framing for buildings; structural joint connectors of metal; metal construction frames; metal door frames; frames of metal for building | ACTIVE | — |
| 007 | Machines for construction purposes, namely, for manufacturing steel construction materials; rolling machines for rolling metals | ACTIVE | — |
| 037 | Building, plumbing, installation services and electrical installation services; cleaning, maintenance and repair, all in relation to rolling machines for rolling metals; cleaning, maintenance and repair, all in relation to construction machines for manufacturing steel construction materials; construction of walls; construction and renovation of buildings and other structures; construction of ceilings; construction of buildings; custom construction of buildings; construction of office buildings; building of offices; installation of machines; machine repair; construction services; building construction | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 15, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 14, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 14, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 18, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 5, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 4, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 4, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 22, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 21, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 18, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 8, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 8, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 31, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |