Drawing for WILDSTONE CONSTRUCTION GROUP

USPTO serial 79430566

WILDSTONE CONSTRUCTION GROUP

Reviewed by CopyMark Law Group

Status 681
Filing date
Status date
Registration date
Examiner
OSGOOD, KRYSTINA E
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WILDSTONE CONSTRUCTION GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction, maintenance, repair, renovation and demolition of buildings; construction and renovation of residential and commercial properties; construction of custom homes; real estate development and construction of sports arenas, mixed-use properties, offices, restaurants; warehouse construction and repair; construction and maintenance of pipelines, mines, bridges, sewers, water treatment plants, solar power plants, wind power plants, geothermal power plants, wave energy power plants, electricity and steam plants, hydroelectric power plants, natural gas cogeneration plants; construction project management services; construction project management in the field of building construction and renovation; building construction supervision of construction work; construction supervising and construction project managing in the field of building construction, site development, building renovation, and building demolition; general building and foundation infrastructure contractor services; construction site preparation, namely, pad preparation; construction services, namely, excavation; land development services, namely, planning and laying out of commercial buildings; real estate development; concrete pouring and forming for buildings and other commercial or public concrete structures; laying of cable; laying of foundations; laying of pipes; contractor services, namely, carpentry and drywall, electrical, foundation, framing, HVAC, painting and plumbing contractor services; mechanical contractor services, namely, installation, maintenance and repair of HVAC systems, plumbing, process piping being pipe laying services, installation of building fire prevention and suppression systems, and building automation equipment; installation, maintenance and repair of air conditioners, boilers, furnaces, heat pumps, heat and energy recovery ventilators, heating installations, hot water heaters, HVAC systems, refrigeration equipment; machinery retrofit services, namely, retrofitting of heating, ventilating and air-conditioning installations in buildings; installation, maintenance and repair of vacuum pumps, pumps and pumping stations; installation, maintenance and repair of water storage tanks, water treatment tanks, and water treatment equipment, namely, water filtration units and reverse osmosis units for commercial and residential use; installation, maintenance and repair of photovoltaic installations, power generation equipment, solar energy based power plants, solar panels and solar installations for generating power, wind power systems; installation, maintenance and repair of electrical charging stations, electrical control panels, electrical network monitoring systems, electrical systems, electric generators, electrical wiring, outlets, light fixtures, switches and electrical panels; installation of electrical and generating machinery; home building renovation; restoration of sports floors; landfill waste management, namely cleaning of waste in landfills.ACTIVE
042Construction project engineering; construction project engineering consulting; engineering coordination and construction drafting in the field of building construction; environmental engineering services; environmental testing services to detect contaminants in soil and water.ACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 18, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Aug 18, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Aug 18, 2026XAECEXAMINER'S AMENDMENT ENTERED
Aug 18, 2026GNEAEXAMINERS AMENDMENT E-MAILED
Aug 18, 2026CNEAEXAMINERS AMENDMENT -WRITTEN
Aug 7, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Aug 7, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 7, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 6, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 6, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 6, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 22, 2026RFNTREFUSAL PROCESSED BY IB
Jan 6, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 6, 2026RFRRREFUSAL PROCESSED BY MPU
Nov 27, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 26, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 25, 2025DOCKASSIGNED TO EXAMINER
Aug 25, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Aug 25, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 21, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance