USPTO serial 79431313
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Installation of renewable energy conversion installations; installation of apparatus for generating power; installation of gas and water pipelines; installation, maintenance and repair of apparatus for supplying gas; construction, repair and maintenance of buildings; construction of buildings and other structures; advisory services relating to the construction of buildings and other structures; construction of buildings, roads, bridges and dams; building project management in the nature of construction supervision; construction and maintenance services relating to civil engineering, namely, plant construction in the oil and gas, refinery, petrochemical, industrial, biologics and environmental and transition fields; construction management and supervision; repair of buildings; demolition of buildings; installation of building automation equipments; construction project management being construction supervision of public water supply or drainage system for others; factory construction; installation of air pollution control facilities; construction of alternative energy generating installations being structures; maintenance of sensors and measuring apparatus; installation of sensors and measuring apparatus; installation of water pollution control facilities; providing information relating to the repair or maintenance of water pollution control equipment; repair or maintenance of water pollution control equipment; installation of apparatus for new energy and regenerative energy production; construction and installation of new energy and regenerative energy production structures being factories; construction of energy efficient buildings and civil engineering structures; building construction services; repair of wastewater treatment apparatus; installation of wastewater treatment apparatus; installation, maintenance and repair of ventilating apparatus. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 26, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 26, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 10, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 10, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 10, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 20, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 20, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 14, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 19, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 18, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 18, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 18, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 31, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 16, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 16, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 31, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 30, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 30, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 29, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 29, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 28, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |