Drawing for E&ABLE

USPTO serial 79431313

E&ABLE

Reviewed by CopyMark Law Group

Reg. 8164207Status 700Registered
Filing date
Status date
Registration date
Mar 10, 2026
Examiner
TATE-NAGHI, JACQUELINE P
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E&ABLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Installation of renewable energy conversion installations; installation of apparatus for generating power; installation of gas and water pipelines; installation, maintenance and repair of apparatus for supplying gas; construction, repair and maintenance of buildings; construction of buildings and other structures; advisory services relating to the construction of buildings and other structures; construction of buildings, roads, bridges and dams; building project management in the nature of construction supervision; construction and maintenance services relating to civil engineering, namely, plant construction in the oil and gas, refinery, petrochemical, industrial, biologics and environmental and transition fields; construction management and supervision; repair of buildings; demolition of buildings; installation of building automation equipments; construction project management being construction supervision of public water supply or drainage system for others; factory construction; installation of air pollution control facilities; construction of alternative energy generating installations being structures; maintenance of sensors and measuring apparatus; installation of sensors and measuring apparatus; installation of water pollution control facilities; providing information relating to the repair or maintenance of water pollution control equipment; repair or maintenance of water pollution control equipment; installation of apparatus for new energy and regenerative energy production; construction and installation of new energy and regenerative energy production structures being factories; construction of energy efficient buildings and civil engineering structures; building construction services; repair of wastewater treatment apparatus; installation of wastewater treatment apparatus; installation, maintenance and repair of ventilating apparatus.ACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 26, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB
Aug 26, 2026FIMPFINAL DISPOSITION PROCESSED
Jun 10, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 10, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Mar 10, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 20, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 20, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 14, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 19, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 18, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 18, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 18, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 31, 2025RFNTREFUSAL PROCESSED BY IB
Oct 16, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Oct 16, 2025RFRRREFUSAL PROCESSED BY MPU
Aug 31, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 30, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 30, 2025DOCKASSIGNED TO EXAMINER
Aug 29, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Aug 29, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 28, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance