Drawing for E&ABLE

USPTO serial 79431564

E&ABLE

Reviewed by CopyMark Law Group

Reg. 8182433Status 700Registered
Filing date
Status date
Registration date
Mar 24, 2026
Examiner
FRIZALONE, SARAH O
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with E&ABLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
042Planning of buildings and infrastructure systems for buildings; engineering services relating to architecture; design of industrial plant; engineering design and consultancy; consultancy and providing information on design of environmental protection facilities; industrial engineering design services; design of industrial machinery; design of environmental protection facilities; measuring and analysis of atmosphere composition, pressure, temperature; environmental engineering research relating to water analysis; technical and scientific research in the field of environmental protection; research and development services in the field of engineering; consultancy in the field of engineering; conducting feasibility studies, namely, technical projects studies in the field of construction; technological services, namely, technological engineering services being the design, inspection and testing of materials, equipment and processes and their performance and efficiency all in the field of plant construction; chemical engineering; conducting of technical feasibility studies relative to gas exploitation; geological research; technological consulting services in the field of alternative energy generation; engineering of power plants; technological consultancy in the field of scientific research about renewable energy production; scientific research in the field of energy; engineering and materials quality control and testing services; scientific research, namely, developing of integrated energy concepts; industrial design, namely, development of industrial processes; providing technological consultancy in the field of gas exploration for the petrochemical industry; providing technological consultancy in the field of gas exploration for the oil refining industry; technological advisory in the field of construction safety; development, updating and maintenance of software and database systems; development of operating system software; creation of control programs for electric operation control and drive modules; programming of software for electronic control systems; design and development of computer software; maintenance and upgrading of computer software; development of computer software systems; computer system monitoring services via remote access to ensure property functioning; computer systems analysis; installation, maintenance and repair of software for computer systems; computer systems integration services.ACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 24, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 24, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Mar 24, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 3, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 3, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 29, 2026GPNXNOTIFICATION PROCESSED BY IB
Jan 28, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jan 14, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jan 13, 2026OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jan 7, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jan 6, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 6, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 6, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 22, 2025RFNTREFUSAL PROCESSED BY IB
Oct 30, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Oct 30, 2025RFRRREFUSAL PROCESSED BY MPU
Sep 12, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 11, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2025DOCKASSIGNED TO EXAMINER
Sep 10, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Sep 10, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 4, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance