Drawing for TSEA

USPTO serial 79431898

TSEA

Reviewed by CopyMark Law Group

Reg. 8518564Status 700Registered
Filing date
Status date
Registration date
Oct 27, 2026
Examiner
STIGLITZ, SUSAN R
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TSEA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dennis S. Prahl

Dennis S. Prahl Ladas & Parry LLP1040 Avenue of the AmericasNew York, NY 10018United States

Goods and services

ClassDescriptionStatusFirst use
001Chemicals for use in industryACTIVE—
004Lubricating oil; industrial oil; electrical energy.ACTIVE—
007Electricity generators; parts, fittings, and components of machines and apparatus for generating electricityACTIVE—
009Integrated circuits; Electric energy protection, control and telecommunication systems comprised primarily of electric relays for power distribution systems, including voltage regulator controls for overvoltage and undervoltage stabilization, intelligent electronic devices (IEDs) and electrical control devices for power systems and supervisory control and data acquisition (SCADA) equipment in the nature of downloadable computer operating software, programmable electrical controllers, human-machine interfaces (HMIs), computer hardware in the nature of data concentrators, and downloadable computer software platforms for supervisory control and monitoring of electrical power systems, substations, transformers, voltage regulators and battery energy storage systems, remote terminal units (RTUs), electrical energy utilization metering devices, communication gateway routers, electronic transmitters and receivers, power quality monitoring devices, power quality analyzers, electrical monitoring meters, oscillograph recorders and energy quality monitoring instruments, and computer hardware, electrical monitors, electrical controllers, intelligent electronic devices (IEDs), communication gateways and energy management equipment, electrical monitoring and control equipment for energy management; Electricity meters; aerials; electric navigational instruments; light-emitting diodes [LED]; computer hardware; apparatus for the production, distribution, and conversion of electrical energy, namely, Battery Energy Storage System (BESS) for electricity storage; electric power transformers; electric distribution transformers; current transformers; electrical reactors; compact electrical substations, namely, pre-assembled, modular units composed primarily of transformers, high-voltage switchgear, and low-voltage electrical equipment; mobile electrical substations, namely, self-contained power generation systems composed primarily of transformers, switchgear, and power surge protection equipment to provide temporary or emergency electrical power; parts and fittings for electric transformers, included in this class; Apparatus for converting electronic radiation to electrical energy, namely, electric energy protection, control and telecommunication systems comprised primarily of electric relays for power distribution systems, including voltage regulator controls for overvoltage and undervoltage stabilization, intelligent electronic devices (IEDs) and electrical control devices for power systems and supervisory control and data acquisition (SCADA) equipment in the nature of downloadable computer operating software, programmable electrical controllers, human-machine interfaces (HMIs), computer hardware in the nature of data concentrators, and downloadable computer software platforms for supervisory control and monitoring of electrical power systems, substations, transformers, voltage regulators and battery energy storage systems, remote terminal units (RTUs), electrical energy utilization metering devices, communication gateway routers, electronic transmitters and receivers, power quality monitoring devices, power quality analyzers, electrical monitoring meters, oscillograph recorders and energy quality monitoring instruments, and computer hardware, electrical monitors, electrical controllers, intelligent electronic devices (IEDs), communication gateways and energy management equipment for energy management, electric power transformers, electric distribution transformers, current transformers, electrical reactors, and compact electrical substations, namely, pre-assembled modular units composed primarily of transformers, high-voltage switchgear, and low-voltage electrical equipment; mobile electrical substations, namely, self-contained power generation systems composed primarily of transformers, switchgear, and power surge protection equipment to provide temporary or emergency electrical power, and parts and fittings for electric transformers, included in this classACTIVE—
035Outsourcing services in the nature of business assistance; business research and business management for others; business consultancy and advisory for others in the field of electrical energy production, distribution, and conversion; market research; all the foregoing specifically for use within the electrical energy, production, distribution and conversion fieldACTIVE—
036Financial management of shares in other companies, namely, equity capital investment; advisory, consultancy, and information services in the stock market fieldACTIVE—
037Installation and maintenance of industrial automation equipment, namely, assembly and disassembly of transformers, including commissioning and energizing of transformers; maintenance, refurbishment, and repair of transformers; installation and maintenance of industrial automation systemsACTIVE—
042Engineering services, information technology services in the field of electrical energy production, distribution and conversion, and computer systems integration; development of industrial automation systems; advisory, consultancy, and information services in the field of selection, implementation, and use of industrial and mechanical hardware and software systems for third parties; advisory, consultancy, and information services on liquids in the field of chemistryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 27, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 27, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 8, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 8, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 2, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 12, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 12, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 12, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Aug 12, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 12, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 23, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 23, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 23, 2026ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 25, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 25, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 25, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 5, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 5, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 5, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 15, 2025RFNTREFUSAL PROCESSED BY IB—
Nov 3, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 3, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 3, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 3, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 3, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 28, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 28, 2025RFRRREFUSAL PROCESSED BY MPU—
Sep 10, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 9, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2025DOCKASSIGNED TO EXAMINER—
Sep 8, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 8, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 4, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance