Drawing for KKT CHILLERS

USPTO serial 79432854

KKT CHILLERS

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
Examiner
SAXTON, EVELYN H
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with KKT CHILLERS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Refrigerating, heating, air-conditioning, drying, ventilating apparatus and installations, namely refrigerators, industrial heating installations, industrial cooling installations, water heaters, radiators, heat pumps, air conditioning units, and replacement parts therefor; mechanical controllers and regulators for liquids and gases being regulating and safety accessories for the aforesaid goods, namely flashback arrestors and reverse flow check valves and replacement parts thereforACTIVE
037Assembly, maintenance and repair of refrigerating, heating, air-conditioning, drying, and ventilating apparatus and installations and parts therefor; installation, maintenance and repair of building and energy technology installations and apparatus, namely, industrial heating installations, industrial cooling installations, water heaters, radiators, heat pumps, air conditioning units, boilers, furnaces, ventilation units, computer systems used to automate and monitor lighting, temperature, and access control, heat and power generators, and decentralized energy storage in the fields of building technology and building management technology; assembly and installation work for the construction, fitting and commissioning of regulating apparatus namely, apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current and liquid flow regulating apparatuses, namely, hydraulic compensators for building-technology systemsACTIVE
042Engineering services, namely technical planning for the development, construction and system design of refrigerating, heating, air-conditioning, drying, sanitary and ventilating apparatuses and installations and parts therefor; engineering services, namely technical consultancy and planning in the fields of building technology, building process control engineering, house automation and building automation; engineering services, namely technical planning of regulating apparatus for building technology systems; creation, installation and maintenance of computer software being building management systemsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 11, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 11, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 5, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jul 16, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 16, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 16, 2026XAECEXAMINER'S AMENDMENT ENTERED
Jul 16, 2026GNEAEXAMINERS AMENDMENT E-MAILED
Jul 16, 2026CNEAEXAMINERS AMENDMENT -WRITTEN
Jul 2, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 2, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 2, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2026RFNTREFUSAL PROCESSED BY IB
Jan 21, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 21, 2026RFRRREFUSAL PROCESSED BY MPU
Dec 18, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 17, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2025DOCKASSIGNED TO EXAMINER
Sep 19, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Sep 19, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 18, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance