Drawing for EPLAN SMART PRODUCTION

USPTO serial 79432912

EPLAN SMART PRODUCTION

Reviewed by CopyMark Law Group

Status 661
Filing date
Status date
Registration date
Examiner
BROWNE, LUCY E
Law office
TMO LAW OFFICE 125

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EPLAN SMART PRODUCTION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Downloadable computer software for optimizing product manufacturing processes for the production of control cabinets and switchgear cabinets for power distribution, based on computer-aided design (CAD) as a result of computer-aided engineering (CAE); downloadable computer software to support assembly and wiring processes in the manufacture of control cabinets and switchgear cabinets for power distribution; downloadable computer software to support the assembly of electrical and fluid power components, the wiring and cabling of electrical components, and the tubing of fluid power components in the manufacturing of control cabinets and switchgear cabinets for power distribution; downloadable computer programs for optimizing product manufacturing processes for the production of control cabinets and switchgear cabinets for power distribution, based on computer-aided design (CAD) as a result of computer-aided engineering (CAE); downloadable computer programs to support assembly and wiring processes in the manufacture of control cabinets and switchgear cabinets for power distribution; downloadable computer programs to support the assembly of electrical and fluid power components, the wiring and cabling of electrical components, and the tubing of fluid power components in the manufacturing of control cabinets and switchgear cabinets for power distribution; data sets, recorded on computer media or downloadable in the field of computer-aided engineering (CAE) and computer-aided design (CAD) services; data files featuring computer-aided engineering (CAE) and computer-aided design (CAD) formulas and data, pre recorded on computer media or downloadable; downloadable computer software for switch cabinet production; downloadable computer software for supporting the assembly, fitting and wiring of switch cabinetsACTIVE
035Advertising services; business management; business organization consulting and advice; business administration; all of the foregoing also provided via the InternetACTIVE
038Providing access to electric telecommunications networks; telecommunications gateway services, namely, providing access to Internet portals; providing access to databasesACTIVE
042Writing of computer programs; development of computer programs for others; computer software development; computer programming services for switch cabinet production and for assisting in the assembly, fitting and wiring of switch cabinets; development of computer programs for others for switch cabinet production and for assisting in the assembly, fitting and wiring of switch cabinetsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 5, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 5, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 5, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 19, 2026RFNTREFUSAL PROCESSED BY IB
Feb 5, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Feb 5, 2026RFRRREFUSAL PROCESSED BY MPU
Jan 11, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jan 10, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2025DOCKASSIGNED TO EXAMINER
Sep 22, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Sep 22, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 18, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance