Drawing for QUICK CERáMICA

USPTO serial 79432964

QUICK CERáMICA

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
Examiner
NADELMAN, ANDREA KOYNER
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with QUICK CERáMICA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019Building materials, not of metal, namely, fiberglass panels, floor boards, and fascia; rigid pipes, not of metal for building; asphalt, pitch and bitumen; transportable buildings, not of metal; monuments, not of metal; non-metallic building materials, namely, tiles, paving stones, slabs for building, listels and skirting boards of ceramic, porcelain tiles, stoneware in the nature or paving stones, marble, stone, granite used in decorative surface applications for countertops and vanity tops, slate, terra-cotta floor tiles, glass and wood for wall and ceiling cladding and for floor paving in the nature of tiles of glass and wood; floor tiles not of metal; jalousies, not of metal; window glass, for building; plate glass windows, for building; bricks; paving slabs, not of metal; building lumber; marble; wooden materials for paving, namely, wood posts, wood beams, wood joists and wood joints; raw material, namely, potters' clay; building panels, not of metal; paving blocks, not of metal; bitumen building paper; stones for building in the nature of fire burrs; building stone; artificial stone; slate; cement slabs; doors, not of metal; wall claddings, not of metal, for building; wall linings, not of metal, for building; furrings of wood; wainscotting, not of metal; floors, not of metal; partitions not of metal being building materials; parquet floor boards; floor boards of wood; planks of wood for building; flashing not of metal for building; ceilings, not of metal; non-metal pantiles; terra-cotta, being building material; roofing tiles not of metal; earth for bricks; casement windows, not of metal; sandstone tubes; chimney shafts, not of metal; insulating glass for building; windows, not of metal; window glass, except glass for vehicle windows, namely, window glass for building; joists, not of metal; beams, not of metal; gypsum for use as building materials; luminous paving stones; tar; asphalt; limestone; reeds, for building; gutters not of metal; chimney pots, not of metal; wood pulp board, for building; paperboard for building; pre-fabricated houses not of metal; cement; chimneys, not of metal; prefabricated buildings for animals, not of metal; plywood; window shutters, not of metal; agglomerated cork for building; rock crystal; quartz; shuttering, not of metal, for casting concrete; building materials, namely, asphalt-based coatings for use on building foundations; duckboards, not of metal; geotextiles; asphalt felt for building; granite; gravel; concrete; sheets and strips of synthetic non-metal materials for horizontal road signage; nonluminous and non-mechanical road signs, not of metalACTIVE
027Carpets, rugs, mats in the nature of door mats and floor mats and matting in the nature of rubber mats, linoleum and other materials for covering existing floors in the nature of carpets and floor mats; wall hangings, not of textile; coverings for floors, namely, floor runners and artificial coverings for surfaces in the nature of non-textile wall coverings; floor coverings in the nature of carpets; artificial floor coverings in the nature of carpets; vinyl coverings for floors in the nature of protective vinyl floor mats; protective floor coverings in the nature of protective clear plastic floor runners; floor coverings in the nature of linoleum tiles; floor coverings with insulating properties in the nature of floor runnersACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 21, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 21, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 15, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 22, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 22, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jun 22, 2026XAECEXAMINER'S AMENDMENT ENTERED
Jun 22, 2026GNEAEXAMINERS AMENDMENT E-MAILED
Jun 22, 2026CNEAEXAMINERS AMENDMENT -WRITTEN
Jun 17, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jun 17, 2026XAECEXAMINER'S AMENDMENT ENTERED
Jun 17, 2026GNEAEXAMINERS AMENDMENT E-MAILED
Jun 17, 2026CNEAEXAMINERS AMENDMENT -WRITTEN
Jun 16, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 16, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 16, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 22, 2026RFNTREFUSAL PROCESSED BY IB
Jan 8, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 8, 2026RFRRREFUSAL PROCESSED BY MPU
Dec 2, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 1, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 25, 2025DOCKASSIGNED TO EXAMINER
Sep 22, 2025MAFRAPPLICATION FILING RECEIPT MAILED
Sep 22, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 18, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance