USPTO serial 79433118
Reviewed by CopyMark Law Group
Status 680 means the examining attorney approved your mark for publication in the USPTO Official Gazette. Publication for opposition usually follows within weeks, opening a 30-day window for third parties to oppose. Watch for publication (status 686) and monitor the 30-day opposition window.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer hardware and software, recorded and downloadable, for measuring, recording, evaluating, controlling, monitoring and/or regulating purposes for test benches in the nature of controlled testing environments to determine material, component and operational strengths; structural parts of the aforementioned goods and associated peripheral equipment, namely, monitors, display devices in the nature of computer monitors and screens, input devices, namely, computers, computing units in the nature of computer hardware, and controller boxes being for hydraulic, pneumatic, or electric actuators of test benches, transmission devices in the nature of cables for transmission of sound, data, and images, output devices, namely, displays and digital input/output scanners, and data storage units being blank digital storage media; recorded computer programs stored on data carriers for use in controlled testing environments, structural testing, and catapult testing, as well as for fatigue testing and fatigue load simulation, and for use in the acquisition and processing of measurement signals, the generation of test bench control signals, the logging of the test sequence of test bench control and measurement signals, the evaluation of results and the management of test and test bench characteristic data; downloadable software programs for the operation of controlled testing environments; program descriptions being downloadable computer program manuals for software used for test benches; measuring, detecting, monitoring and controlling devices, namely, motion detectors, flow switches, electric actuators, automatic valves; pressure sensors and electric sensors, and output devices, namely, indicator lamps in the nature of pressure indicators, power status indicators, and error indicators, and displays, namely, computer display screens and small LCD screens embedded in controller boxes for hydraulic, pneumatic, or electric actuators of test benches; testing and quality control devices, namely, quality control instruments in the nature of scientific instrumentation for analyzing the qualities of materials, crash test catapults being impact simulation test equipment in the nature of crash test dummies, crash barriers, and crash tracks, dynamic or static fatigue testing machines in the nature of machines for analyzing the strength and endurance of materials, flow test machines in the nature of machines for measuring flow rate and ease of flow of materials, and impact testing machines in the nature of machines that measure the toughness of a material to withstand shock or force; test benches, namely, crash test catapults being impact simulation test equipment in the nature of crash test dummies, crash barriers, and crash tracks, dynamic or static fatigue testing machines in the nature of machines for analyzing the strength and endurance of materials, flow test machines in the nature of machines for measuring flow rate and ease of flow of materials, impact testing machines in the nature of machines that measure the toughness of a material to withstand shock or force, rheological testing machines being scientific instrumentation for measuring flow rate of fluids, and thermomechanical testing machines being scientific instrumentation for measuring thermomechanical changes in or on a material; servo-hydraulic system testing benches, namely, crash test catapults being impact simulation test equipment in the nature of crash test dummies, crash barriers, and crash tracks, dynamic or static fatigue testing machines in the nature of machines for analyzing the strength and endurance of materials, rheological testing machines being scientific instrumentation for measuring flow rate of fluids, and thermomechanical testing machines being scientific instrumentation for measuring thermomechanical changes in or on a material; electrical system testing benches, namely, crash test catapults being impact simulation test equipment in the nature of crash test dummies, crash barriers, and crash tracks, dynamic or static fatigue testing machines in the nature of machines for analyzing the strength and endurance of materials, rheological testing being machines scientific instrumentation for measuring flow rate of fluids, and thermomechanical testing machines being scientific instrumentation for measuring thermomechanical changes in or on a material; electrical and servo-hydraulic test apparatus and instruments, namely, scientific instrumentation for analyzing and measuring structural durability, strength, flexibility, stress-impact, strain-impact, and qualities in or of materials; components of test benches, namely, actuator modules and sensor modules being computers and computer hardware and controller modules being power modules in cases with controller for actuators and sensors; electric safety monitoring apparatus, namely, actuator movement monitoring and control modules | ACTIVE | — |
| 037 | Installation, repair and maintenance of machinery; installation, repair and maintenance of testing machines and instruments; advisory services relating to the installation of safety equipment; consultancy services in the fields of installation, repair, and maintenance of machinery, testing machines, testing instruments and safety equipment; consultancy services in the fields of installation, repair, and maintenance of crash test catapults, dynamic or static fatigue testing machines, flow test machines, impact testing machines, rheological testing machines, thermomechanical testing machines | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 28, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 27, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 26, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 26, 2026 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 21, 2026 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| Aug 21, 2026 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| Aug 21, 2026 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Aug 10, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 10, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 10, 2026 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 28, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 28, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 28, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 15, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 15, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 15, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 11, 2025 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 21, 2025 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 21, 2025 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 2, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 1, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 29, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 28, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 28, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 25, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |