USPTO serial 79433772
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric compressors being components for heat pumps; electric compressors being components for heating systems | ACTIVE | — |
| 011 | Cooling installations comprised of air cooling apparatus for industrial use; freezing installations comprised of commercial refrigerators and freezers and replacement parts and fittings therefor; commercial refrigeration units; electric cooling fans; cooling units for industrial purposes; dryers for cooling systems, namely, drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; industrial cooling units; refrigerating display cabinets; cooling systems, namely, cooling installations, cooling devices and apparatus being combined heat and power (CHP) installations in the nature of air conditioning and air purifying installations for heating and cooling of buildings, homes, greenhouses, and industrial processes; HVAC units; heating elements and wires being heating elements; heating installations; industrial heating installations; central heating installations; solar heating installations; solar heat storage collectors for heating; heat controller valves being structural components of heating installations; heat exchangers not being parts of machines, evaporators and pipe being structural components for heating installations; heat pumps; heat exchangers not being parts of machines, and controllers being structural components for heat pumps; commercial cooling units for industrial purposes | ACTIVE | — |
| 035 | Business consultancy; wholesale store services featuring refrigeration equipment, cooling installations, freezing installations, commercial refrigeration units, electrical cooling fans, cooling installations, dryers for refrigeration systems, industrial refrigeration systems, refrigerated displays, refrigerated storage systems, air-conditioning equipment and energy-efficient refrigeration systems, heating, ventilation, air-conditioning and purification systems, HVAC systems for heating, ventilation and air-conditioning, heating elements and wires, heating installations, industrial heating installations, central heating installations, solar heating installations, solar heat storage equipment for heating, heat controller valves being parts of heating installations, compressors, heat exchangers, evaporators and pipe systems being parts of heating installations, heat pumps, compressors, heat exchangers and controllers being parts of heat pumps, solar heating installations, heat installations, energy management systems, thermal management systems, industrial energy systems, as well as related to industrial thermal systems. | ACTIVE | — |
| 037 | Installation and maintenance of cooling installations, freezing installations, cooling equipment, commercial refrigeration units, electric cooling fans, cooling systems, dryers for cooling systems, industrial cooling systems, refrigerated displays, refrigerated storage systems, air-conditioning equipment, heating, ventilation, air-conditioning and purification systems, HVAC systems for heating, ventilation and air-conditioning, heating elements and wires, heating installations, industrial heating installations, central heating installations, solar heating installations, solar heat storage equipment for heating, heat controller valves being parts of heating installations, compressors, heat exchangers, evaporators and pipe systems being parts for heating installations, heat pumps, compressors, heat exchangers and controllers being parts for heat pumps; installation and maintenance of solar thermal systems; installation and maintenance of heating installations; installation of thermal insulation for buildings; installation of insulation for buildings by using the thermal properties of the structures; installation and maintenance of energy management systems; installation and maintenance of thermal management systems; installation and maintenance of industrial energy systems for optimising energy efficiency inside buildings | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 18, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 4, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 4, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 4, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 22, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 22, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 19, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 4, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 4, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 7, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 6, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 22, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 3, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 3, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 2, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |