Drawing for WINDCRETE

USPTO serial 79434357

WINDCRETE

Reviewed by CopyMark Law Group

Reg. 8374728Status 700Registered
Filing date
Status date
Registration date
Aug 4, 2026
Examiner
LEASER, ANDREW C
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with WINDCRETE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Melissa Dangond

Melissa Dangond Allen, Dyer, Doppelt & Gilchrist. P.A.255 South Orange Avenue, Ste. 1401Orlando, FL 32801United States

Goods and services

ClassDescriptionStatusFirst use
019Transportable buildings and shelter structures, other than tents, not made of metal; semi-worked Wood; artificial wood being polyethylene board material used as a wood substitute ; unwrought or semi-wrought stone, clay, bitumen or concrete; materials and elements for construction and building, not of metal, namely, precast concrete platforms, towers and foundations for offshore wind turbines ; works of art, ornaments and sculptures of stone, bitumen or concrete; doors, not of metal; windows, not of metal; coverings for windows being outdoor blinds not of metal and not of textileACTIVE—
037Rental of tools, machines and equipment for construction, demolition, cleaning and maintenance; charging of batteries and energy storage devices and rental of equipment therefor; mining extraction services for the extraction of natural resources; pest control services for disinfection, extermination and control of pests, other than for agriculture, aquaculture, horticulture and forestry; building construction and demolition services; excavation and mining extraction services for natural resourcesACTIVE—
042Testing and authentications of concrete structures for offshore wind turbines ; quality control for others; scientific and technological services, namely, engineering, research, analysis, and testing in the field of offshore wind energy; design services, namely, civil and structural engineering design of concrete platforms and foundations for offshore wind turbines; information technology services, namely, design and development of computer software for the design, installation, operation and decommissioning of offshore wind energy and infrastructureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 4, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 4, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 4, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 16, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 16, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 10, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 19, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 21, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 21, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 21, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 18, 2025RFNTREFUSAL PROCESSED BY IB—
Dec 2, 2025RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 2, 2025RFRRREFUSAL PROCESSED BY MPU—
Oct 19, 2025RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 18, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 11, 2025DOCKASSIGNED TO EXAMINER—
Oct 10, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 10, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 9, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance