Drawing for UCF2

USPTO serial 79435529

UCF2

Reviewed by CopyMark Law Group

Status 645Office Action
Filing date
Status date
Registration date
—
Examiner
VAGHANI, MAYUR C
Law office
TMO LAW OFFICE 124

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 645: Status 645 means the USPTO mailed a final refusal maintaining at least one objection to your application. You can respond, appeal to the Trademark Trial and Appeal Board, or allow the application to abandon.

Need help with UCF2?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ralph E. Locher

PO Box 222480Hollywood, FL 33022United States

Goods and services

ClassDescriptionStatusFirst use
006Metal scaffolding for facades; facade construction components of metal, namely, metal facade panels for construction purposes, sidewalls of metal for building, building boards of metal, tiles of metal for building; facade elements of metal, namely, metal facade panels for construction purposes, sidewalls of metal for building, building boards of metal, tiles of metal for building; cladding of metal for building, construction facades; metallic building facade elements, namely, metal facade panels for building construction purposes, sidewalls of metal for building, building boards of metal, tiles of metal for building; ventilated curtain facades of metal, namely, metal facade panels for construction purposes; glued facades of metal, namely, metal facade panels for construction purposes; fasteners of metal, namely, bolts, nails, rivets, screws and linings of metal for building purposes, namely wall and ceiling linings for facade and composite systems; substructures for buildings of metal, namely, pillars of metal for buildings, reinforcing materials of metals for buildings, building boards of metal, building panels of metal; frames of metal for buildings; slabs of metal for building, beams of common metal for building, and shuttering elements of metal in the nature of metal shutters for facade and composite systems; wall linings of metal for building; internal wall cladding of metal for building; wall tiles of metal; metal panels for walls; metal door, ceiling, building panels; wall platings of metal, namely, plating compositions composed of metal, plated steels, steel plates and sheets.ACTIVE—
019Facade construction components, namely, facade panels for construction purposes, concrete panels, building panels of non-metallic materials; facade elements of non-metallic materials, namely, facade panels for construction purposes, concrete panels, building panels, roof panels, flooring panels; nonmetal cladding for facades for building; non-metal building fronts, namely, wind protection screens; facade panels not of metal for use in building construction purposes; ventilated curtain facades, not of metal, namely, facade panels for construction purposes; glued facades, not of metal, namely, facade panels for construction purposes; facade components of glass, namely, facade panels for construction purposes, building glass, insulated glass, glass panes, glass bricks, glass roofing tiles; facade elements of glass, namely, facade panels for construction purposes, glass panels for building and construction purposes; facade cladding of glass, namely, facade panels for construction purposes, slates for wall cladding, non-metal cladding for construction and building; facade panels of glass for building for construction purposes; facade panels of glass for use in building for construction purposes; ventilated curtain facade panels of glass for construction purposes; glued facades panels of glass for building for construction purposes; refractory construction materials, not of metal, and cladding, not of metal, for building being wall and ceiling cladding linings for facade and composite systems; substructures for buildings, not of metal, namely, concrete building panels, concrete walls for building, non-metal pillars for building, and shuttering elements, not of metal, namely non-metal shutters for facade and composite systems; wall linings, not of metal, namely, ceramic tiles for lining for building; internal wall cladding, not of metal for building; wall tiles, not of metal; wall boards, not of metal; wall elements, not of metal, namely, wall boards, wall tiles, slates or wall panels, precast concrete wall forms, concrete walls for building; wall panelling made of non-metallic material.ACTIVE—
037Installation of facade construction components, facade elements of metal, cladding for facades; installing siding; installation of prefabricated building elements; construction of prefabricated buildings; installation of wall linings for building; installation of internal wall cladding, wall tiles of metal, metal panels for walls, metal wall elements, wall panelling of metal; construction of walls; installing wallboard.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 7, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 7, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 7, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 14, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 14, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 14, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 12, 2026RFNTREFUSAL PROCESSED BY IB—
Feb 26, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 26, 2026RFRRREFUSAL PROCESSED BY MPU—
Jan 30, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 29, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2026DOCKASSIGNED TO EXAMINER—
Nov 1, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 1, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 30, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance