Drawing for Serial No. 79435683

USPTO serial 79435683

Serial No. 79435683

Reviewed by CopyMark Law Group

Status 645Office Action
Filing date
Status date
Registration date
—
Examiner
KRUSSMAN, IAN GEORGE
Law office
TMO LAW OFFICE 126

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 645: Status 645 means the USPTO mailed a final refusal maintaining at least one objection to your application. You can respond, appeal to the Trademark Trial and Appeal Board, or allow the application to abandon.

Need help with Serial No. 79435683?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Brown

Michael J. Brown Michael J Brown Law Office LLC354 Eisenhower ParkwayPlaza 1, 2nd Floor, Suite 2025Livingston, NJ 07039

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; data processing equipment and computers; fire extinguishers; downloadable or recorded software for the field of civil engineering, energy generation, energy distribution and water treatment; downloadable digital image, audio, video files in the fields of civil engineering, energy generation, energy distribution and water treatment authenticated using non-fungible tokens (NFTs); downloadable software based on blockchain technology for the field of civil engineering, energy generation, energy distribution and water treatment; downloadable or recorded software for staging and accessing digital exhibitions; downloadable or recorded 3D animation software; downloadable or recorded virtual and augmented reality software for the field of civil engineering, energy generation, energy distribution and water treatment; downloadable mobile applications for the management and transmission of information; electric and electronic information storage apparatus in the nature of blank CDs, blank USB flash drives; downloadable training guides in electronic format in the field of civil engineering, energy generation, energy distribution and water treatment; downloadable instruction manuals in electronic format in the field of panel sets, water temperature indicators and gas detecting instruments; downloadable or recorded energy and water training software; downloadable computer software for information management; downloadable or recorded computer software for accessing information directories that may be downloaded from the global computer network; downloadable electronic publications, namely, books, magazines, newsletters in the field of water and energy; water level indicators; water leak detection alarms; scientific apparatus for determining water content; water meters; water temperature indicators; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic cells, solar modules, and solar panels; photovoltaic apparatus for converting solar radiation to electrical energy, namely, photovoltaic cells, solar modules, and solar panels; gas flow control apparatus and gas flow regulators for domestic, commercial and agricultural use; alarms for the detection of inflammable gases; solar-powered rechargeable batteries; solar batteries; flue gas and waste gas analyzers; gas detecting instruments for detecting the presence and concentration of gas; gas analysis and detection apparatus for detecting the presence and concentration of gas; gas measuring instruments in the nature of gasometers; solar panels for generating electricity; transformers; transformers being power units; electricity limiters; electricity inverters; apparatus and instruments for accumulating and storing electricity, namely, batteries and power cells; solar panel sets consisting of photovolatic cells, transformers and inverters; solar panels for production of electricity; photovoltaic modules; electronic sensors for measuring solar radiation; electricity measuring instruments; downloadable or recorded civil engineering software for the design and construction of structuresACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 8, 2026GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 8, 2026GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 8, 2026CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 4, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 4, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 4, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 27, 2026ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 19, 2026RFNTREFUSAL PROCESSED BY IB—
Mar 5, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 4, 2026RFRRREFUSAL PROCESSED BY MPU—
Feb 4, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 3, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 31, 2026DOCKASSIGNED TO EXAMINER—
Jan 30, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 30, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 30, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance