USPTO serial 79436279
Reviewed by CopyMark Law Group
Status 680 means the examining attorney approved your mark for publication in the USPTO Official Gazette. Publication for opposition usually follows within weeks, opening a 30-day window for third parties to oppose. Watch for publication (status 686) and monitor the 30-day opposition window.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Steven J. Hultquist
Steven J. Hultquist HULTQUIST, PLLC510 Meadowmont Village Circle PMB #363Chapel Hill, NC 27517United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting the distribution of electricity; apparatus and instruments for conducting electricity; apparatus and instruments for switching electricity; apparatus and instruments for switching the use of electricity; apparatus and instruments for switching the distribution of electricity; apparatus and instruments for transforming electricity; apparatus and instruments for accumulating electricity; apparatus and instruments for accumulating and storing electricity; apparatus and instruments for regulating electricity; apparatus and instruments for controlling electricity; electricity distribution boxes; electrical cells and batteries; battery chargers; photovoltaic apparatus for converting solar radiation to electrical energy, namely, photovoltaic modules; charging docks being battery charge devices; chargers for batteries; accumulators, electric; accumulators for photovoltaic power; batteries; auxiliary battery packs; battery boxes; battery compensation chargers; battery packs; charging appliances for rechargeable equipment; dry-cell batteries; galvanic batteries; galvanic cells; lithium batteries; portable power supplies being rechargeable batteries; rechargeable cells; solar batteries; solar batteries for domestic use; solar batteries for industrial use; solar-powered rechargeable batteries; supercapacitors for energy storage; ultracapacitors for energy storage; uninterruptible electrical power supplies; power units being batteries; power packs being batteries; push-on accumulators; rechargeable batteries; alkaline accumulators; all-solid-state batteries; anode batteries; AC/DC power supplies; apparatus and instruments for transforming the distribution of electricity; apparatus and instruments for regulating the distribution of electricity; apparatus and instruments for controlling the distribution of electricity; apparatus and instruments for regulating the use of electricity; apparatus and instruments for controlling the use of electricity; distribution transformers; electric voltage transformers; electric power supply units; electric power distribution apparatus; electric power controllers; electric current transformers; electronic transformers; electronic power controllers; electronic power supplies; electronic power transformers; high voltage transformers; power controllers; power units being transformers; voltage transformers; energy regulators; power conditioning apparatus; electricity limiters; switches, electric. | ACTIVE | — |
| 039 | Electricity supply and distribution; distribution and transmission of electricity; electricity distribution via cables; consultancy services relating to the distribution of electricity; distribution of energy; electricity distribution; information and advisory services in relation to the distribution of energy; providing information relating to the distribution of electricity; distribution of renewable energy. | ACTIVE | — |
| 042 | Engineering services relating to energy supply systems; technological consultancy in the fields of energy production and use; scientific research in the field of energy; technological services, namely, scientific research, technological analysis, and product testing in the fields of battery energy storage systems, electrical power distribution systems, and energy management systems, and scientific research relating thereto; industrial engineering design services; advisory services relating to energy efficiency; design and development of regenerative energy generation systems; consultancy relating to technological services in the field of power and energy supply; technological consulting services in the field of alternative energy generation; engineering services; electrical engineering services; development of energy and power management systems; energy auditing. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 14, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 14, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 14, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 14, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 14, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 20, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 20, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 20, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 20, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 20, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 18, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 17, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 6, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 7, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 7, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 6, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |