USPTO serial 79436906
Reviewed by CopyMark Law Group
Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Daniel J. Hudak, Jr.
Daniel J. Hudak, Jr. Hudak, Shunk & Farine Co. LPA30B Northwest Ave., Suite 210Tallmadge, OH 44278United States| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Sealing adhesive for building; sealing adhesive for the attaching of vapor barriers and vapor retarders for building, and of roof underlays for building; adhesives for the building industry, for the construction and building industry and for industrial purposes; roofing adhesive and adhesives for wall coverings, for vapor barriers for building, for vapor retarders for building and for roof underlays for building; adherent substances for use in industry for adhesive tapes, for vapor barriers and vapor retarders for building and for roof underlays for building. | ACTIVE | — |
| 009 | Electric sensors for vapor barriers, vapor retarders for building purposes and roof underlays for building purposes and monitoring instruments and apparatus for monitoring vapors and/or vapor barriers. | ACTIVE | — |
| 017 | Insulating paints and plastic masses for sealing for insulating purposes; water-based insulating paints and insulating plastic masses, all the aforesaid goods for use as building insulation; packing and insulating strips, vapor barriers, vapor barriers for building, roof underlays for building and insulating textile fabrics, all the aforesaid goods for use as coated and uncoated building insulation; weldable sealing and insulating membranes, weldable vapor barriers for building, weldable vapor retarders for building, weldable roof underlays for building and weldable insulating fabrics of textile material, all the aforesaid goods for use as building insulation; elastomeric sealing material being vapor impermeable, of polymers, of ionomers, polyamides, of ethylene acrylic acid copolymers and polyester, of olefins, of polypropylene, of polyurethane and of polyethylene, all the aforesaid goods for use as building insulation; weatherstripping compositions in the nature of caulk; adhesive sealant and caulking compound; adhesive caulking compounds; sealants for the attaching of vapor barriers and vapor retarders for building, and of roof underlays for building, all the aforesaid goods for use as building insulation; draught excluder strips; sealing strips for the attaching of vapor barriers and vapor retarders for building, and of roof underlays for building, all the aforesaid goods for use as building insulation; substances for insulating buildings against moisture, air-permeable substances for insulating buildings against moisture; foils, plastic film and foil tapes of plastic, of elastomers, of polymers, of ionomers, polyamides, of ethylene acrylic acid copolymers and polyester, of olefins, of polypropylene, of polyurethane and of polyethylene other than packaging materials, all the aforesaid goods for use as building insulation; foil and foil tapes for shielding against electromagnetic interference and for electromagnetic protection, all the aforesaid goods for use as building insulation; foil and foil tapes for the insulation of buildings; woven fabrics of carbon fibres for use as building insulation; joint fillers, water-tight rings, weatherstrippings, seals and sealing profiles, all the aforesaid goods for use as building insulation; insulation materials, insulating materials and barrier materials, all the aforesaid goods for use as building insulation; adhesive sealants in the form of tapes, strips, bands and films; vapor-permeable adhesive tapes, strips, bands and films, all the aforesaid goods for use as building insulation; adhesive-coated plastic sheets, vapor barriers, vapor retarders for building and roof underlays for building, all the aforesaid goods for use as building insulation. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 13, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 7, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 16, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 18, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 18, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 18, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 26, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 12, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 11, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 7, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 6, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 27, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 14, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 14, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 13, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |