USPTO serial 79437544
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Theodore R. Remaklus
Theodore R. Remaklus Thompson Hine LLP312 Walnut Street, Suite 2000Cincinnati, OH 45202-4024United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Metal welding apparatus, gas operated; electric arc metal welding apparatus; electron beam metal welding apparatus; electric resistance metal welding apparatus; laser metal welding devices; robotic electric metal welding apparatus; electric arc welding apparatus; electric arc welding machines; electron beam welding machines; gas-operated welding machines; electric resistance welding apparatus; soldering apparatus, electric; industrial robots for welding; metalworking machine tools; metalworking machines; electric metal welding machines; electric welding machines; electric welding machines for metalworking; laser welding machines; robotic electric welding apparatus being welding robots; industrial robots; robotic arms for welding, construction and repair purposes being industrial robots; industrial welding robots incorporating remote controls | ACTIVE | — |
| 009 | Remote control apparatus for welding machines, electric soldering apparatus, electronic navigational and positioning apparatus and instruments, welding robots and robotic welding equipment, robotic arms for welding, construction and repair purposes for industrial operations; remote control apparatus for welding machines, electric soldering apparatus, electronic navigational and positioning apparatus and instruments, welding robots and robotic welding equipment, robotic arms for welding, construction and repair purposes; telecommunication machines and instruments, namely, telecommunication switches, telecommunication transmitters, automatic switching apparatus for telecommunications, computer network switching hubs; electronic remote control apparatus for robots excluding gaming apparatus; electronic navigational and positioning apparatus and instruments; electronic data processing apparatus; computer software, downloadable and recorded, for use in welding by operating remote-controlled welding robots; downloadable and recorded computer software for use in training on how to operate welding robots and robotic welding equipment; downloadable and recorded computer software for use in the training of welding operators; downloadable application software for operation of remote-controlled welding robots; downloadable application software for use in training users in the operation of welding robots and robotic welding equipment; downloadable application software for use in the training of welding operators; recorded computer operating programs; downloadable computer programs for operation of remote-controlled welding robots; downloadable computer programs for use in training users in the operation of welding robots and robotic welding equipment; downloadable computer programs for use in the training of welding operators | ACTIVE | — |
| 037 | Construction of buildings, roads, bridges and dams; construction of chemical plants; construction of factories; construction of tunnels; construction of airports; pipeline construction; harbour construction; construction of civil engineering structure; construction of power plant; construction of geothermal, thermal, hydroelectric, nuclear, wind, wave energy and solar power plant equipment; construction of reactor, reactor pressure vessel, cooling system, steam turbine and generator, condenser, reactor containment vessel, reactor building, all for nuclear power plants, and the facilities directly connected thereto; construction of equipment for decommissioning of nuclear reactors being the maintenance of nuclear power plants and construction of equipment for disposal of nuclear reactors; construction of space habitation modules being the construction of modular homes | ACTIVE | — |
| 040 | Welding services; welding services using welding robots; metalworking; metal treatment; rental of industrial robots for use in welding; rental of industrial robots for use in metalworking; rental of metalworking machines and tools; rental of welding apparatus; welding for construction purposes; welding by welding robots for construction purposes | ACTIVE | — |
| 041 | Training in welding skills; providing educational assessment services relating to welding skills; providing educational examinations and tests relating to welding skills; training in semi-automatic remote welding skills; providing educational assessment services relating to semi-automatic remote welding skills; providing educational examinations and tests relating to semi-automatic remote welding skills; educational and instruction services, namely, conducting classes, seminars, workshops in the field of welding skills; educational and instruction services, namely, conducting classes, seminars, workshops in the field of semi-automatic remote welding skills; educational testing services, namely, analysis and evaluation of the results of ability test and aptitude test and provision of information relating thereto; conducting training courses in the field of welding technology and developments therein; conducting training seminars in the field of welding technology and developments therein; arranging, conducting and organization of seminars relating to welding skills; arranging, conducting and organization of seminars in the field of welding technology and developments therein | ACTIVE | — |
| 042 | Design, programming and maintenance of computer software systems for use in welding by operating remote-controlled welding robots; design and maintenance of computer software for use in welding by operating remote-controlled welding robots; design, programming and maintenance of computer software; design and maintenance of computer programs; technological advice relating to the operation of computers, used in connection with welding apparatus and equipment and industrial robots, as well as the operation of welding apparatus and equipment and industrial robots; providing and rental of non-downloadable computer software systems for use in welding by operating remote-controlled welding robots; providing and rental of online non-downloadable computer software for use in welding by operating remote-controlled welding robots; rental of computers; providing computer programs on data networks, namely, providing user access to computer programs in data networks | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 12, 2026 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 12, 2026 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 12, 2026 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 16, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 16, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 5, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 20, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 20, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 16, 2025 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 15, 2025 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2025 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 10, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 10, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 5, 2025 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 21, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |