Drawing for INDUCTION BY GAMESA

USPTO serial 79438163

INDUCTION BY GAMESA

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
DINALLO, KEVIN M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with INDUCTION BY GAMESA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Janice Housey

Janice Housey Litmus Law PLLC4 Weems Lane #240Winchester, VA 22601United States

Goods and services

ClassDescriptionStatusFirst use
007Machinery for the generation and storage of electrical energy, for marine propulsion; Machine tools and power tools, namely, electrical and electronic apparatus and equipment all for use in generating energy; Engines and motors, other than for land vehicles; Electrical generators; Generators, namely, geothermal power generators, gas operated power generators; Power installations, namely, electrical power installations; Machine parts, namely, powertrains and mechanical controls for the operation of electrical machines and engines; Power transmissions, other than for land vehicles; Motors, namely marine motors, machine motors, alternating current motors; Electric marine propulsion units; Marine propulsion apparatus, namely, thrusters for machinery in the nature of marine propulsion apparatus; Alternators; Engines and motors for the generation of electricity; Induction, synchronous and permanent magnet machines for generation of energy, for marine propulsion; Shaft electricity generators; Synchronous electricity generators for hydro power plants; Submerged electricity generators; Wind power electricity generators; Hydroelectric generators; Parts and fittings for all the aforesaid goods as far as not included in other classesACTIVE—
009Apparatus and instruments for conducting, switching, converting, storing, regulating electricity or controlling the generation, distribution or use of electricity; Inverters; Apparatus and instruments for conducting and distributing electricity; Electronic equipment for regulating and controlling hydro power systems and wind energy systems; Parts and fittings for all the aforesaid goods as far as not included in other classesACTIVE—
037Erection, construction, assembly, installation, maintenance, servicing and repair services of power plants, machines and machine parts and equipment in the field of wind energy, hydro power, renewable energy installations; Installation and repair services with regard to generators and motors; Servicing of manufacturing machines and apparatus; Installation and repair services for renewable energy systems; Maintenance services with regard to generators and motors; Installation, assembly, maintenance, supervision and repair of systems, products and equipment used in power generation, transmission and distribution, electrical engineering and mechanical engineeringACTIVE—
040Generation of electricity from wave, wind sources; Energy generation, processing and transformation services; Renewable energy production; Energy transformation, that is energy production through the conversion of wind into electrical energyACTIVE—
042Scientific and technological services, namely, research and design relating thereto in the field of wind energy, hydro power, renewable energy, conventional energy, motors, generators, alternators, maritime industries; Technology design and planning for power stations, generators, alternators, motors and turbines; Quality control and testing services for electrical equipment; Industrial design services; Electrical and mechanical engineering servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 22, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 22, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 16, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 28, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 26, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 26, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 26, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 6, 2026CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 26, 2026RFNTREFUSAL PROCESSED BY IB—
Mar 6, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 6, 2026RFRRREFUSAL PROCESSED BY MPU—
Feb 6, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 5, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2026DOCKASSIGNED TO EXAMINER—
Dec 22, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Dec 22, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 22, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 22, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Dec 22, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 5, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 5, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 4, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance