Drawing for MOONWATT

USPTO serial 79438908

MOONWATT

Reviewed by CopyMark Law Group

Reg. 8428721Status 700Registered
Filing date
Status date
Registration date
Sep 15, 2026
Examiner
STURMAN, MELISSA M
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MOONWATT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alexander Lazouski

Alexander Lazouski Lazouski IP LLCSuite 1, 14726 Bowfin Ter.Lakewood Ranch, FL 34202United States

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, distributing, transforming, storing, regulating, and controlling electricity in the nature of electrical controlling devices; energy storage systems primarily comprising batteries for stationary applications; electric batteries, including those based on sodium-ion and lithium-ion technologies; batteries for energy storage installations; battery management systems (BMS) primarily comprised of batteries; battery chargers; power electronic systems for the conversion of energy in the nature of electric converters; solar inverters; hybrid inverters for solar and storage power plants; electric control devices for energy management and solar installations; downloadable software for energy management and control; downloadable software for optimizing the storage, usage, and distribution of renewable energy; measuring, monitoring, and control devices in the nature of electrical controlling devices for energy storage systems; electric energy monitoring sensors; downloadable computer software for managing and integrating energy storage systems with solar power installations; downloadable digital computer software platforms for real-time monitoring and control of renewable energy systems; data acquisition and analysis tools in the nature of data processing equipment for energy infrastructureACTIVE—
037Installation, maintenance, and repair of energy storage systems and related infrastructure, including systems based on sodium-ion and lithium-ion battery technologies; installation and servicing of solar inverters and hybrid solar-storage inverters; installation, maintenance and repair of solar power plants and apparatus and equipment for the generation of renewable energy; installation, maintenance and repair of energy systems and infrastructure; installation, maintenance and servicing of stationary energy storage systems and related power electronic apparatusACTIVE—
042Design and development of energy storage systems and renewable energy systems; scientific and industrial research in the fields of battery storage and renewable technologies, including sodium-ion and lithium-ion battery technologies; development of technology, namely, solar inverters, battery inverters and hybrid inverters for integrated solar and storage systems; development of software for energy management, storage, and distribution; software engineering optimized for co-located solar and storage installations; technological consultancy in the field of the energy transition; consulting services for integrating energy storage into renewable energy infrastructure; technical consulting in the nature of technical assessment and analysis of energy systems; engineering services relating to electricity storage, smart grids, and renewable integration; design, development and commercialization in the nature of new product design of battery management systems (BMS) and energy management systems (EMS) firmware and software; provision of cloud-based platforms in the nature of providing virtual computer systems through cloud computing for monitoring and controlling distributed energy systems; technical support, namely, help desk services for energy infrastructureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 25, 2026CRSNCORRECTION SENT TO IB—
Sep 25, 2026CRCRCORRECTION CREATED FOR IB—
Sep 15, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 15, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 21, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 21, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 15, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 24, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 11, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 11, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 11, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 11, 2026RFNTREFUSAL PROCESSED BY IB—
May 23, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 23, 2026RFRRREFUSAL PROCESSED BY MPU—
Apr 8, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 7, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 16, 2026DOCKASSIGNED TO EXAMINER—
Dec 12, 2025MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 12, 2025NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 11, 2025REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance