USPTO serial 79439385
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicholas D. Wells
Nicholas D. Wells Legends Law Group, PLLC330 Main St.Kaysville, UT 84037United States| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Flexible plumbing pipes of plastic; flexible plastic pipes for plumbing use; flexible plastic pipes for plumbing purposes; flexible tubes of plastic; flexible plastic tubes; flexible tubes made of plastic; pipe fittings comprised primarily of plastic; non-metal connectors for flexible hoses; non-metal junctions for flexibles pipes; junctions, not of metal, for flexible pipes; non-metallic fittings for flexible pipes; non-metal fittings for flexible pipes; non-metal fittings for pipes; couplings, not of metal, for rigid pipes; couplings and joints, not of metal, for pipes; Junctions, not of metal, being parts of rigid water pipes; joints, not of metal, for pipes; non-metallic couplings for pipes; junctions for pipes, not of metal; fittings, not of metal, for rigid pipes; non-metal junctions for pipes; non-metallic junctions for pipes; non-metallic junctions for rigid pipes; non-metallic junctions for flexible pipes | ACTIVE | — |
| 019 | Materials, not of metal, for building, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; construction materials, non-metallic, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metallic building materials, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metallic architectural mouldings for building; non-metallic architectural moldings for building; materials, not of metal, for building and construction, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; materials, not of metal, for construction, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metallic rigid pipes for building purposes; building materials, non-metallic, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metallic materials for building and construction, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metallic minerals for building or construction; drainage pipes, not of metal; secondary moisture drainage systems consisting of non-metal troughs and collection boxes; plastic conduits for drainage; construction materials of plastic, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; plastic building construction materials, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; building materials of plastic, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; construction materials made of plastic, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; construction materials of plastics; non-metallic drainage pipes; non-metal sewer pipes; non-metallic rigid pipes for use as building materials; non-metallic rigid pipes for construction; non-metallic water pipes; non-metal water pipes; non-metallic construction materials, namely, non-metal maintenance shafts, access chambers, pipes, couplings and fittings for sewer, stormwater and subsoil drainage systems; non-metal manhole covers; manhole covers, not of metal | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 25, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 25, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 7, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 7, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 2, 2026 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 1, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 17, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 17, 2026 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 11, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 5, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 4, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 4, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 4, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 22, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 22, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 7, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 6, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 24, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 19, 2025 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 19, 2025 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 18, 2025 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |