Drawing for A ALGOLOAM

USPTO serial 79444035

A ALGOLOAM

Reviewed by CopyMark Law Group

Reg. 8465834Status 700Registered
Filing date
Status date
Registration date
Sep 29, 2026
Examiner
HUDSON, TAMARA BREE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with A ALGOLOAM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joel Karni Schmidt

Joel Karni Schmidt Cowan, Liebowitz & Latman, P.C.114 West 47th Street, 21st FloorNew York, NY 10036-1525United States

Goods and services

ClassDescriptionStatusFirst use
007Construction machines, namely, textile fabrication machines, namely, custom-made robotic weaving machines and automatic looms for weaving, textile knitting machinery, namely, industrial robots, machines and structural components thereof for loam constructionACTIVE—
019Reinforcing materials for building, not of metal, in particular woven or knitted textile bindings made of natural fibers for use in the building industry; doors, walls, and ceiling panels, not of metal; buildings, transportable, not of metalACTIVE—
020FurnitureACTIVE—
037Building construction; providing information in the field of manufacturing construction materialsACTIVE—
042Scientific and technological services, namely, research and design relating to architecture, new product design, prefabricated elements assembly, construction elements assembly and diassembly methods, statical and topological optimisation of walls, methods for materials reusage; industrial analysis and research in the field of engineering, computational design, and CAD sotfware developement; industrial design; quality control for others and authentication services in the fields of construction, architecture, interior and industrial design; design and development of computer hardware and softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 29, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 29, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 11, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 11, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 6, 2026GPNXNOTIFICATION PROCESSED BY IB—
Aug 5, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 22, 2026OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 22, 2026OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 9, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 9, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 9, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Jul 9, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 9, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 11, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 11, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 11, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 14, 2026RFNTREFUSAL PROCESSED BY IB—
Apr 28, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 28, 2026RFRRREFUSAL PROCESSED BY MPU—
Mar 19, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 18, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2026DOCKASSIGNED TO EXAMINER—
Feb 20, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 20, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 19, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance