Drawing for CONVERDAN

USPTO serial 79444492

CONVERDAN

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
MCCARTHY, JOSEPH PATRICK
Law office
TMO LAW OFFICE 127

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with CONVERDAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Industrial machines for electric power conversion.ACTIVE—
009Electrical components for power management, energy distribution, rectification and conversion; non-insulated and insulated electric power modules, active front end (AFE) units and power management components, namely power sources, power distribution units (PDUs), uninterruptible power supplies (UPS), battery banks, power monitoring and control systems, load balancers, transformers, circuit breakers and fuses with liquid and air cooling; electric power units for integration into grid-connected and off-grid systems; electrical and electronic devices and equipment, being integrated power supply modules, DC-to-DC converters (DC/DC), active front end (AFE) modules, rectifiers, inverters and voltage regulators; galvanically isolated electrical converters and non-isolated electrical converters for energy management and power supply; electrical components and systems for voltage regulation, electrical conversion, power monitoring and grid connection; electrical power supply solutions, namely electric power management devices and power electronics components for use in renewable energy systems, battery chargers, energy storage systems, electric car chargers, industrial installations and power grids.ACTIVE—
042Custom design and engineering of industrial machines for electric power conversion; custom design and engineering of electrical components for power management, energy distribution, rectification and conversion in automated systems, production plants, energy systems and electrical machines; custom design and engineering of non-insulated and insulated electric power modules, active front end (AFE) units and power management components, namely power sources, power distribution units (PDUs), uninterruptible power supplies (UPS), battery banks, power monitoring and control systems, load balancers, transformers, circuit breakers and fuses with liquid and air cooling; custom design and engineering of electric power units for integration into grid-connected and off-grid systems; custom design and engineering of electrical and electronic devices and equipment, being integrated power supply modules, DC-to-DC converters (DC/DC), active front end (AFE) modules, rectifiers, inverters and voltage regulators; custom design and engineering of galvanically isolated electrical converters and non-isolated electrical converters for energy management and power supply; custom design and engineering of electrical components and systems for voltage regulation, electrical conversion, power monitoring and grid connection; custom design and engineering of electrical power supply solutions, namely electric power management devices and power electronics components for use in renewable energy systems, battery chargers, energy storage systems, electric car chargers, industrial installations and power grids.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 17, 2026RFNTREFUSAL PROCESSED BY IB—
Aug 30, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 30, 2026RFRRREFUSAL PROCESSED BY MPU—
May 27, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 26, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 26, 2026DOCKASSIGNED TO EXAMINER—
Feb 27, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 27, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 26, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance