USPTO serial 79445111
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machine coupling and transmission components (except those for land vehicles); transmission belts (other than for land vehicles); drive belts (other than for land vehicles); pulleys (parts of machines and/or motors and engines); belts and rollers for machines; motors and engines (other than for land vehicles); belts and reels for conveyor systems; transmission systems (machines) and driving machines; conveyor belts and tracks, roller and rubber tracks for use in belt conveyor apparatus, also used as parts for snow groomers and snowplows; machines, devices and apparatus for fastening and connecting; membrane filters and valve diaphragms for use as parts of machines, membranes for filter plates and filter presses for use as parts of machines. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 30, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 14, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 14, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 28, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 27, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 20, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 2, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 6, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 6, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 5, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |