USPTO serial 79445684
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials; structures and transportable buildings of metal; metal hardware; metal ironmongery; scaffolding of metal; prefabricated scaffolds of metal; tower scaffolding of metal; beams of common metal; metal staircases; metal ramps; access platforms of metal; access platforms of metal for for use with scaffolding; metal scaffolding boards; platform staging of metal for use with scaffolding; shoring struts of metal; props of metal; metal tubes; metal barriers; safety barriers of metal; metal gates; waste bins [skips] of metal for industrial use; metal decking; PVC covers for scaffoldings of metal. | ACTIVE | — |
| 009 | Downloadable software; downloadable software for building scaffolding structures; protective and safety equipment; components and parts for non-metal safety barriers; safety harnesses; safety nets. | ACTIVE | — |
| 019 | Building materials, not of metal; structures and transportable buildings, not of metal; scaffolding, not of metal; shoring struts, not of metal; stairways, not of metal for use in buildings; non-metal decking; non-metal roof coverings; PVC roofing membrane; PVC covers for scaffoldings (non-metallic); non-metal safety barriers. | ACTIVE | — |
| 022 | Ropes; strings; nets; tents; awnings; tarpaulins. | ACTIVE | — |
| 037 | Construction services; scaffolding; installation of building scaffolds, working and building platforms; scaffolding rental; installation of security and safety equipment; installation, in the field of the following goods: hazard warning barriers; installation services of staircases of metal; rental of metal stairways; advisory services relating to the construction of buildings and other structures; construction via industrial rope access. | ACTIVE | — |
| 041 | Providing training courses relating to scaffolding and construction; providing training courses relating to industrial rope access. | ACTIVE | — |
| 042 | Construction design; engineering services; engineering services in the field of building technology; engineering services in the field of scaffolding; planning and design of scaffolding; planning and design of protective and safety equipment; planning and design of safety barriers; planning and design of metal stairways; planning and design of access platforms; inspection and testing via industrial rope access; structural surveying via industrial rope access; providing online, non-downloadable software; providing temporary use of on-line non-downloadable software development tools. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 18, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 1, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 1, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 21, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 20, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 18, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 15, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 15, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 12, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |