USPTO serial 79446617
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Sensors for railroad tracks, sensors for connecting to railroad rails, sensors for sensing rail vehicles, railway loads and railroad strains; optical and electrical conductors for transmitting data along a railroad track; fiber optic cables; optical and electronic instruments for reading rail sensors; optical and electronic instruments and signal converters for data transmission via optical conductors for railroad tracks. | ACTIVE | — |
| 037 | Laying, fastening, connecting and maintaining sensors on railroad tracks, pre-treatment of railroad tracks for fastening sensors. | ACTIVE | — |
| 039 | Sensing the position, speed, number of axles, weight, integrity and type of a rail vehicle [transport information]. | ACTIVE | — |
| 042 | Sensing the integrity and maintenance status of railroad tracks, ballast beds, track panels and rails [technical supervision and inspection]. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 3, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 18, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 17, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 16, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 15, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 4, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 27, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 27, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 26, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |